Download Print this page

GNE Honeybee350 Installation & User Manual page 9

Gne module level optimization and monitoring system

Advertisement

5. Connection to Swarm and Beehive
Determine where the Beehive is installed
and the length of RS485 cable from the
Beehive to the Swarm
Open the back covers of the Beehive to the
Swarm
Connect the 485 cable to the RS485 port
numbered 1 on the Beehive (refer to the
right table for the wiring connection table)
and tighten it with a flat head screwdriver.
Connect the other end of the 485 cable to
any one RS485 interface of the Swarm, and
the wiring order of the four color wires of
the RS485 in the Swarm and the Beehive are
c o n s i s t e n t .
N o t e
connection order would cause damage to
the Swarm or the Beehive.
Tighten the screws on the back cover of the
S w a r m a n d t h e B e e h i v e w i t h a c r o s s
screwdriver.
: A n y e r r o r i n t h e
The wiring connection table of Swarm and Beehive
Swarm
Cascade
Swarm
RS485
RS485
Terminal
Terminal
485B
485B

485A
485A

GND
GND

12V
12V

 
Beehive
RS485
RS485
Terminal 1
Terminal 2
485B
485B

485A
485A

GND
GND

VCC
VCC-USER

 
A third
device
RS485
Terminal
485B

485A

GND


Advertisement

loading