Gne module level optimization and monitoring system

Advertisement

3. Installation of optimizers or PV monitors
①. Record the product MACID numbers of the optimizers
or PV monitor on the system form or power station map
or construction drawing to establish a power station in
cludy center for tracking the operation status of each
panel even the whole PV station.
②. Use a screw or cable tie to position the optimizer or
PV monitor one by one according to the registered
MACID number position, and fix it on the bracket or panel
frame. If the bracket has no mounting holes, it can be
drilled and mounted with a hole size of 6mm.
Remarks:
W h e n c o n n e c t i n g t h e d u a l m o d u l e o p t i m i z e r
Honeybee700/800 to one PV panel, one pair of the
input cables of the optimizer are connected the
output ends of the PV module, and the other pair is
directly docked.
③. The shorter pair of cables of the power optimizer or
the PV monitor are the input terminals, and the longer
pair of cables are the output terminals for the power
optimizer or the PV monitor to be connected in series and
finally connected to the inver or the combiner box.
Cabling sequence: firstly connect all the input cables of
the optimizers to the output cables of the PV junction box,
then connect the output cables of all the optimizers in
series (please refer to the previous page for notes)