INSTALLATION INSTRUCTIONS
TO INSTALL:
1. Dig a hole to appropriate depth allowing for rough-in-section to
be secured to conduit.
Door Screws
Flush Pour Shield
Temporary Cover Plate
Rough-in-Section
(RIS)
Flush Pour Shield
Temporary
Cover Plate
Rough-in-
Section (RIS)
©2007 Acuity Brands Lighting, Inc.
Rev. 11/28/07
INS-PDX7_REV0
Rough-in-Section (RIS) before
pouring finish grade
NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT
NOTICE. Any dimension on this sheet is to be assumed as a reference
dimension: "Used for information purposes only. It does not govern
manufacturing or inspection requirements." (ANSI Y14.5-1973)
PARADOX SERIES
Installation should be performed by a qualified
electrician in accordance with the National Electrical Code
2. To install with door flush to finish
grade:
2a. Mount Rough-in-Section
(RIS) with flush pour shield
placed at finish grade.
Pour Screw
Door
Finish
Grade
Enlarged detail
with temporary
cover plate and
flush pour
shield.
Finish
Grade
Rough-in-Section (RIS) after
pouring finish grade
and relevant local codes.
Finish
Grade
Enlarged detail
with door
installed.
PDX7
Rough-in-
Section (RIS)
12881 Bradley Ave
Sylmar, CA 91342
Phone: 818-362-9465
Fax: 818-362-6548
www.hydrel.com
Need help?
Do you have a question about the Paradox Series and is the answer not in the manual?
Questions and answers