Safty Instructions
Important: Read Before Commissioning
•
The user must ensure that all operators are familiar with this operating manual and
follow it at all times.
•
The operating manual must be read carefully before the instrument is mounted,
installed and commissioned.
•
All actions taken must follow the operating manual.
•
Installation and commissioning may only be carried out by appropriately qualified
personnel with due regard for all rules and regulations that are in force.
•
When the instrument is connected to mains voltage, it must not be opened.
•
If the instrument is visibly damaged, it must not be installed, wired up or
commissioned.
•
If the instrument does not work after commissioning, it must be
the mains.
•
Any further laws, standards, guidelines, etc. relevant to this product must be
complied with.
Additional information on EML 1101 Maximum Demand Controller and Add-on
station EMD1101
•
Loads
which may cause damage or danger when disconnected by EML1101 or
EMD1101 must
•
The responsibility for correct load settings, such that proper operation is
guaranteed and no damage or danger arises, remains 100% with the customer.
not be connected to the load channels.
disconnected
from
1
Need help?
Do you have a question about the EML 1101 and is the answer not in the manual?
Questions and answers