Download Print this page

Prior To Installation; Product Information; Installation Instructions - Ecoboil EB Rapid Series Installation And Maintenance Instructions

Automatic over bench water boilers

Advertisement

Prior to installation:

• Max Inlet Pressure: 2,000 kPa
• We recommend the fitting of a water filter.
• Only teflon tape to be used where necessary. Under no
circumstances is plumbing paste to be used.
• Do not connect to hot water line or the fire hydrant supply – to do
so will void the warranty.

Product Information:

This unit is fitted with a computerised element and boil dry protection.
The computer is set at 97 Degrees C, altitude will alter the boiling
point.
• If fitted with a filter we recommend changing the cartridge every
12 months.
• The manufacturer recommends cleaning and servicing the unit
every 24 months, or every 12 months in hard water areas.
• If the supplied power cord is damaged, it must be replaced by an
electrician.

Installation Instructions:

1. Fit tap and shank on to the outlet connection provided.
2. Mount unit on the wall using fixing points on the back of the unit.
It is advisable to position the tap outlet over a drain board so that
in the event of a leaking tap the water can be disposed via the sink.
3. Connect water supply to the 15mm inlet through a stop tap in the
supply line (stop tap to be provided by the installer).
4. Connect the overflow pipe to waste water or any other area where
water can be disposed of in a safe manner.
5. Turn on water supply and allow the unit to fill.
7. Open tap and check that water is flowing from the tap.
8. One water is flowing plug in the unit to a standard 3 Pin 10 Amp
Power Socket and switch on the power.
9. Leave for a few minutes to check that water is heating.
AFTER POWERING ON – ALLOW 20 MINUTES BEFORE USING

Advertisement

loading