Page 1
EB Rapid Series Automatic Over Bench Water Boilers Installation and maintenance instructions Please read prior to installation WHAT’S IN THE BOX: 1 x EB Rapid Over Bench Boiling Unit 1 x EB 104 Complete Urn Tap Important This unit must be installed by an authorised plumber The unit to be connected in accordance with AS 3500.4.1...
Prior to installation: • Max Inlet Pressure: 2,000 kPa • We recommend the fitting of a water filter. • Only teflon tape to be used where necessary. Under no circumstances is plumbing paste to be used. • Do not connect to hot water line or the fire hydrant supply – to do so will void the warranty.
Trouble Shooting SYMPTOM CAUSES ACTION Water overflowing Water level too high Check and set water level to 30mm below overflow pipe, remove float valve washer; clean and reinstall or replace and adjust ball valve arm if necessary Remove float and check to ensure that there is no water in it - replace if necessary Continuous boiling Float valve defective...
Page 4
Max Inlet pressure 2,000 kPa Overflow/Vent Inlet Port Port 15mm 15mm For more information about Ecoboil and our products: Ecoboil Appliances Limited Phone 09 238 2209 Fax 09 282 4073 Mail P.O. Box 940, Pukekohe 2340 Web www.ecoboil.co.nz Water boilers...