Klarstein Windwaker Eco Manual page 92

Hide thumbs Also See for Windwaker Eco:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 61
EN
Indoor
Wall pipe
92
2
Reserve a certain length of drain hose and power cord for installation when binding
them. When binding to a certain degree, separate the indoor power and then
separate the drain hose.
Connection pipe
Indoor power cord
3
Bind them evenly.
4
The liquid pipe and gas pipe should be bound separately at the end.
Note: The mains power cable and the control cable must not be crossed or wrapped
around each other. The drain hose should be located on the underside.
Step 9: Suspend the Indoor Air Conditioner
1
Put the bound pipes in the wall pipe and then make them pass through the wall
hole.
2
Hang the indoor unit on the wall-mounting frame.
3
Stuff the gap between pipes and wall hole with sealing gum.
4
Fix the wall pipe.
5
Check if the indoor unit is installed firmly and closed to the wall.
Outdoor
Sealing gum
Drain hose
Tape
Lower hook of
wall-mounting frame
Upper hook

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents