Download Print this page

Therma-Tru Pre-hung Door Systems Installation Instructions Manual

Therma-tru pre-hung door systems installation instructions

Advertisement

Available languages

Available languages

Quick Links

Builder, Subcontractor or Supplier:
Please forward these instructions to the homeowner.
The application performance standards for these products may be governed by
the International Residential Code, International Building Code and other state
and jurisdictional requirements. Copies of performance ratings are available
on our website at www.thermatru.com.
Installation Instructions for
Pre-hung Door Systems
These installation instructions are designed to assist door installers who have
an understanding of carpentry principles, and know how to properly and
safely use power tools. The purpose of these instructions is to illustrate how
to install a Therma-Tru door system using methods and materials that help
eliminate water related leaks. If the directions are closely followed, the door
system will have a long useful life with good resistance to rain related water
intrusion problems.
These methods are "tried and true" They are used widely by builders and
remodelers who are serious about managing and keeping water outside the
home. Rather than eliminate any steps that may be unclear to you, please call
1-800-THERMATRU and ask for clarification. If you remain unclear, please
seek more professional assistance with the installation.
Different parts of the country have different code requirements, which may
not be covered in these instructions. The installer is responsible for insuring
the installation complies with local codes.
requirements that do not appear please contact 1-800-THERMATRU.
Required Tools & Materials: 2 & 6 foot Levels, Hammer, Putty Knives
(firm & flexible), Framing Square, Caulking Gun, Sturdy Ladder, Shims,
Tape Measure, High Quality Elastomeric or Polyurethane Sealant, Screw
Gun/Drill -1/8 inch Drill Bit, Razor Knife, #2 & #3 Philips Bit, Stapler,
Insulating Material, Eye Protection, Water Resistive Barrier, Flashing
Material, #8 x 2-1/2 inch Exterior Grade Screws, & Optional Sill Pan.
Read all instructions before starting.
Therma-Tru Recommended Best Practices
Use Water Resistive Barrier and Flexible Flashing:
We recommend the use of a Water Resistive Barrier
(WRB) applied to the exterior sheathing (OSB or
other) and the use of an adhesive or flexible flashing
product to seal around the opening. The WRB should
be cut in the opening (follow manufacturer's
guidelines) with the head of the flap taped up, to be
sealed later in Step 11. The flashing should be applied
in an overlapping manner as shown, always working
from
the
guidelines).
If you have unique code
bottom
up
(follow
manufacturer's
Use a Sill Pan: We recommend you first "dry fit" the sill pan in the opening,
following the instructions furnished with the sill pan. Place the right and left
sill pan ends tight against the sides of the opening. Check the center section
for proper length and if necessary, cut with a hack saw or tin snips. Be sure to
allow 2 inches of overlap at the joints.
Note: Use only the PVC cement provided in the sill pan kit to glue the pieces
together. The sill pan must be sealed to the sub-floor using an Elastomeric or
Polyurethane sealant, but do not apply sealant to the bottom of the sill when
using a sill pan.
Step 1: Check Door Unit.
Check width and height.
Measure size of frame (width and height), not
brickmould.
Remove cleats and packaging, but keep door
fastened closed with transport clip. Do Not
remove the transport clip until instructed to do
so later in Step 7.
Step 2: Check and Prepare Opening.
Note: If additional floor covering clearance is required, attach the shim board
to the sub floor. Be sure to caulk well under the shim board.
Is the opening square? Check all corners with a framing square. Double check
by comparing diagonal measurements. Fix any problems now.
Is the opening the correct size for the
door unit? Check it against the door
frame size now, before installation. The
opening should be frame height plus 1/2
inch, and frame width plus 1/2 inch to
3/4 inch. Fix any problems now.
Are the framing and walls PLUMB? Use
a 6 foot level and check both sides of the
opening, both ways (front to back and
right to left). Fix any problems now.
Is the sub floor level and solid? Provide
a flat, level, clean weight bearing
surface so the sill pan or sill can be
properly caulked and sealed to the
opening. Scrape sand or fill as required.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Pre-hung Door Systems and is the answer not in the manual?

Questions and answers

Summary of Contents for Therma-Tru Pre-hung Door Systems

  • Page 1 The purpose of these instructions is to illustrate how to install a Therma-Tru door system using methods and materials that help eliminate water related leaks. If the directions are closely followed, the door system will have a long useful life with good resistance to rain related water intrusion problems.
  • Page 2 Step 2 cont.: Check and Prepare Opening. Check to be sure the framing walls around the opening are in the same plane. performing a “string test” for plumb. String Test for Plumb: Attach a string diagonally across the opening from the outside, as shown. The string(s) should gently touch in the center, if not the opening is “out of plumb”...
  • Page 3 Step 5: Shim at Hinge Locations and Secure Hinge jamb. Leave door fastened and closed with transport clip. Shim above screws, behind each hinge location, between the opening and the jamb. Use a 6 foot level and re-check hinge jamb to ensure it is plumb and straight.
  • Page 4: Finishing Instructions

    Using a clean rag, wipe off the stain to the color shade you desire. Remove any excess stain from the panel grooves with the foam brush provided; allow the stain to dry for at least 6 hours before applying topcoat. See Therma-Tru Same-Day Stain™ Finishing Kit instructions for complete details.
  • Page 5 El propósito de estas instrucciones es demostrar la manera de instalar un sistema de puertas Therma-Tru mediante el uso de métodos y materiales que ayudan a eliminar las filtraciones relacionadas con el agua. Si se siguen cuidadosamente las instrucciones, el sistema de puertas tendrá...
  • Page 6 Paso 2, cont.: revise y prepare la abertura. Aseqúrese de que las paredes que enmarcan el perímetro de la abertura están en el mismo plano. Hágalo realizando una prueba con un cordel para verificar que está a plomo. Prueba con cordel para verificar que está a plomo: Coloque un cordel que cruce diagonalmente la abertura desde el exterior, como se muestra.
  • Page 7 Paso 5: coloque calzas en las ubicaciones de las bisagras y asegure la jamba con bisagras. Deje la puerta fija y cerrada con el sujetador para transporte. Coloque calzas sobre los tornillos, detrás de cada ubicación de las bisagras, entre la abertura y la jamba. Use un nivel de 6 pies y vuelva a verificar la jamba con bisagras para asegurarse de que está...
  • Page 8 Therma-Tru Same-Day Stain™. Aplique el tinte con un paño. Mientras más tiempo se deje el tinte para “asentarse” antes de limpiarlo, más oscuro será el color. Use un paño limpio para limpiar el tinte hasta lograr el tono del color que desea.