Please accept our thanks and our congratulations on your choice For a complete list of accessories and details of their compatibil- of product. ity, refer to the Catalogue. Riello S.p.A. CONFORMITY GITRÈ boilers conform to the following directives: − Directive 92/42/EEC on efficiency requirements −...
GENERAL INFORMATION GENERAL INFORMATION 1.2 Precautions The operation of any appliance that uses fuel, electrical power 1.1 General Safety Information and water demands that a number of fundamental safety pre- cautions be respected: Check that the product is complete, undamaged and as or- Do not allow children or infirm persons to operate the sys- dered as soon as you receive it.
GENERAL INFORMATION 1.3 Description of the appliance 1.4 Safety and control devices The GITRÈ boiler is an oil fuelled hot water boiler capable of low GITRÈ boilers incorporate the following safety and control de- temperature functioning. GITRÈ versions are designed only for vices: central heating applications.
The products are identified by: GITRÈ Serial number plate This is located on the boiler body and specifies the serial number, model, and main technical specifications. T067793GE RIELLO S.p.A. Via Ing.Pilade Riello 7 37045 Legnago (VR) - ITALY Mod. Qn(max) Cod. Pn(max) N°...
Page 7
GENERAL INFORMATION GITRÈ B/100 Control panel Burner Storage cylinder drain cock 12 Boiler body CH circuit drain cock 13 Flue gas exhaust fitting Automatic vent valve 14 Domestic cold water inlet Storage cylinder 15 DHW circulation Casing 16 Storage cylinder temperature sensor socket Non-return valve 17 DHW outlet Boiler circulator...
Page 8
GENERAL INFORMATION BURNER Pump Oil pump pressure adjuster screw Burner controller Pressure gauge fitting Reset button with lockout indicator Photoresistor Flange with seal 10 Combustion head Air damper adjuster screw Motor Air intake OIL PUMP Suction port Return By-pass screw Pressure gauge fitting Pressure adjuster screw Vacuum gauge fitting...
GENERAL INFORMATION STORAGE CYLINDER GITRÈ 5 B/100 Type of storage cylinder Vitrified steel Storage cylinder layout Vertical Heat exchanger layout Vertical Maximum power absorbed 24,9 DHW water temperature setting range 0-70 °C Storage cylinder capacity Coil water capacity Coil heat exchange surface area 1,02 Domestic hot water production (∆T 35°C) (*) 48°C...
GENERAL INFORMATION 1.9 Control panel GITRÈ Function selector Burner reset Boiler temperature gauge Displays the temperature of the central heating water Boiler thermostat Allows you to set the temperature of the central heating water (setting range 55-82°C) Electrical power indicator (green) Lights to show that the boiler is receiving electrical power Burner lockout indicator (red) Lights to show that the burner locked out...
Page 13
GENERAL INFORMATION GITRÈ B/100 Function selector Burner reset Boiler temperature gauge Displays the temperature of the central heating water Boiler thermostat Allows you to set the temperature of the central heating water (setting range 55-82°C) Electrical power indicator (green) Lights to show that the boiler is receiving electrical power Burner lockout indicator (red) Lights to show that the burner locked out Summer (I) / Winter (II) selector...
The instruction manual is an integral part of the boiler. Once located, read it thoroughly and keep it safe. Keep the documentation envelope in a safe place. Any re- placement documents must be ordered from Riello S.p.A. who reserve the right to charge for the cost of the replace- ment.
INSTALLATION 2.3 Moving and removing the packing − Remove the polystyrene edge protectors (2) − Pull off the protective bag (3). If the installation involves a lot of moving (e.g. to a rooftop or cellar utility room) do not remove the protective wooden cage until the boiler is at its place of installation.
(Refer to the reference values on page 22); See Riello S.p.A.’s Catalogue The manufacturer declines all responsibility for damage caused by incorrectly constructed flue systems.
INSTALLATION 2.6 Water connections GITRÈ B/100 The following figures and tables give the dimensions and po- sitions of the water fittings for (GITRÈ and GITRÈ B/100) boilers. Before installing the boiler, flush out all the pipes of the central heating circuit to remove any machining residues. GITRÈ...
INSTALLATION 2.7 Typical water system schematics Typical schematic - Central heating system - GITRÈ CENTRAL Boiler CENTRAL HEATING Central heating system man- HEATING ifolds FLOW RETURN Disconnect valves Pumps Non-return valves Automatic vent valve Boiler safety valve Boiler drain cock System filling cock 10 Water softener filter CH expansion vessel...
INSTALLATION 2.8 Fuel connections Priming the pump GITRÈ boilers have their fuel connections at the rear. Fuel supply To prime the oil pump simply start up the burner and check for hoses must pass through the hole (1) in the back of the boiler a flame.
INSTALLATION 2.9 Combustion gas exhaust 2.9.1 Technical specifications of stack The flue pipe (1) and the connection to the stack (2) must be The stack must satisfy the following requirements:: made in conformity to the laws, standards and regulations ap- −...
Page 21
INSTALLATION BOILER CONFIGURATIONS C13 - C33 Connections in configuration C33 If comburent air is drawn from outdoors, the appliances are type C "sealed" and the boiler room does not require ventilation. C13 Concentric wall vent. Twin flue pipes can also be used, but the wall through-pipes must be concentric or located close enough to be subjected to similar wind conditions.
INSTALLATION 2.10 System filling and emptying 2.10.2 Filling GITRÈ boilers require a filling pipe connected to the central heating circuit return pipe. Turn the mains power switch OFF and turn the control panel function selector to (0) before filling or draining the system. −...
INSTALLATION − Close the water supply shut-off cocks; GITRÈ B/100 − To empty the boiler, connect a rubber hose (5) (internal diameter Øint=12mm) to the hose union on the boiler's drain cock (1). − To empty the storage cylinder, connect a rubber hose (5) (internal diameter Øint=12mm) to the hose union on the storage cylinder's drain cock (2) (GITRÈ...
INSTALLATION 2.11 Wiring diagram GITRÈ 4 COM.G. CO1A L1 N PE TA TA LPI NPI PE N PE 230V ~ 50Hz Power supply COM.G. 3 position function selector Mains power indicator Burner lockout indicator White Safety thermostat (110°C 0/-6) (*) Boiler control thermostat (55 - 82°C) (*) Minimum temperature thermostat...
Page 25
INSTALLATION GITRÈ 5-GITRÈ 6 COM.G. CO1A L1 N PE TA TA LPI NPI PE N PE 230V ~ 50Hz Power supply COM.G. 3 position function selector Mains power indicator Burner lockout indicator White Safety thermostat (110°C 0/-6) (*) Boiler control thermostat (55 - 82°C) (*) Minimum temperature thermostat (50°C) (*)
Page 26
INSTALLATION GITRÈ 5 B/100 COM-G. COM-E/I CO1A CO2A LPI NPI PE LPB NPB PE TA TA N PE 230V ~ 50Hz Power supply COM.E/I Summer/Winter selector COM.G. 3 position function selector Mains power fuse 6.3 A-T Burner lockout indicator Electric power supply signal CO1-CO1A Multi-connectors CO2-CO2A Multi-connectors...
INSTALLATION 2.12 Electrical connections − Unscrew the fixing screw (C) and remove the protective cover (D); GITRÈ boilers are fully cabled in the factory. The only connections required for their installation are those of the mains power sup- ply, room thermostat and central heating circuit pump. Proceed as follows to access the control panel terminals: −...
Page 28
INSTALLATION − Make the electrical connections as shown in the follow- The following is mandatory: ing diagrams; − The use of an omnipolar magnetothermic switch, line disconnecting switch in compliance with CEI-EN stand- Connections to be made by the heating engineer – control ards (contact opening of at least 3 mm) panel terminal strip −...
COMMISSIONING AND MAINTENANCE 3 COMMISSIONING AND MAINTENANCE − Open the control panel access door; 3.1 Preparing for initial startup The boiler must be started up for the first time by the manufac- turer's Technical Assistance Service. Perform the following checks before starting up the boiler: −...
COMMISSIONING AND MAINTENANCE ONLY FOR GITRÈ B/100 MODELS − Adjust the boiler and storage cylinder thermostats to − Turn the boiler’s mains power switch ON; about the middle of the section with three lines; − Turn the Summer/Winter selector to (II) Winter; −...
COMMISSIONING AND MAINTENANCE 3.2.2 Resetting the burner and safety thermostat − The "Summer/Winter" selector is set to (II) "Winter", the boiler thermostat is adjusted to its minimum setting and To restore normal startup conditions, open the protective cover the storage cylinder temperature setpoint is changed over the control panel and turn the function selector to posi- (GITRÈ...
COMMISSIONING AND MAINTENANCE FUNCTIONING MODE Provided all the above conditions are satisfied, start the boiler up again, then analyse the combustion fumes. Performance display The sampling hole for flue gas analysis must be located along When the pump is running, LED 1 is green. The four yellow LEDs the straight section of flue at a distance (L) from the boiler ex- indicate the pump's instantaneous electrical power consump- haust.
COMMISSIONING AND MAINTENANCE 3.3.2 Burner control and adjustment ADJUSTING PUMP PRESSURE Turn the adjuster screw (5) to achieve the pressure setting spec- ified in the table. GITRÈ 4 GITRÈ 5 GITRÈ 6 GITRÈ 5 B/100 Adjusting pump pressure 12 bar 12 bar 11 bar (*) Burner with oil heater...
COMMISSIONING AND MAINTENANCE 3.3.3 Burner functioning and programming Cycle times ONLY FOR GITRÈ 4 MODELS ≤ Program for functioning with heater Normal functioning 600 (*) POWER ON ≤ ≤ 3 repeats Times are expressed in seconds. (*) independent of burner controller DESCRIPTION Standby: the burner waits for a heat request Flashing green...
Page 35
COMMISSIONING AND MAINTENANCE Lockout caused by ignition failure Lockout caused by extraneous light during pre-purging POWER ON POWER ON Lockout Lockout Flashing green Flashing Flashing green orange Flashing orange Flashing green Flashing green, red Signal not needed HT Heat request Cycle times PH Pre-heater Thermostat for enabling start-up after pre-heating...
Page 36
COMMISSIONING AND MAINTENANCE ONLY FOR MODELS GITRÈ 5-GITRÈ 6-GITRÈ 5 B/100 Cycle times Program for functioning without heater Normal functioning ≤ POWER ON 600 (*) ≤ ≤ 3 repeats Flashing green Flashing orange Green Times are expressed in seconds. (*) independent of burner controller DESCRIPTION Flame failure during functioning * Standby: the burner waits for a heat request...
Page 37
COMMISSIONING AND MAINTENANCE Lockout caused by ignition failure Lockout caused by extraneous light during pre-purging POWER ON POWER ON Lockout Lockout Flashing green Flashing orange Flashing orange Flashing green Flashing green, red Signal not needed HT Heat request Cycle times FM Fan motor ID Ignition electrode ≤...
Page 38
COMMISSIONING AND MAINTENANCE Functioning status display Reset button Seconds Flash Functioning status Reset button LED colour time Pre-heating time Slow Flashing GREEN Pre-ventilation Slow Flashing ORANGE Safety time Slow Flashing GREEN Normal functioning position Steady ON GREEN Extraneous light or false flame signal Slow GREEN, RED alternate flashing Power supply frequency error...
Page 39
COMMISSIONING AND MAINTENANCE MAIN BURNER FUNCTIONS POST-PURGING OIL PRE-HEATING FUNCTION (GITRÈ 4 model) The post-purging function keeps the fan running for a set time after the burner shuts down provided there is no new heat re- The burner has an oil pre-heating function. When the boiler quest.
Page 40
COMMISSIONING AND MAINTENANCE Menu access block diagram NORMAL FUNCTIONING (FLAME LIT) AND STANDBY BURNER STATE TYPE OF SHUTDOWN TEST POST-PURGING LIGHT DETECTION CONTROLLED LAST LOCKOUT FUNCTION SHUTDOWN IN MEMORY AND RESTART BUTTON 25 SECS. 5 SECS. 10 SECS. 15 SECS. 20 SECS.
Page 41
COMMISSIONING AND MAINTENANCE LIGHT DETECTION SHUTDOWN TEST Enabling/disabling sequence: If the reset button is pressed and held down for a time between − programming permitted in NORMAL FUNCTIONING and 5 and 10 seconds during normal functioning, the burner shuts STANDBY mode; down, the fuel oil valve closes, the flame goes out and then the −...
Page 42
COMMISSIONING AND MAINTENANCE EXTRANEOUS LIGHT OR FALSE FLAME SIGNAL RESET / REMOTE RESET BUTTON ERROR If extraneous light or a false flame signal is detected when the If the reset or remote reset button is held down for more than 60 seconds, the LED flashes to indicate an error until the button is fan motor is running during pre-purging, the burner stays in released.
COMMISSIONING AND MAINTENANCE 3.4 Temporary shutdown ONLY FOR GITRÈ B/100 MODELS − in addition to the previous operations, turn the storage To switch the boiler off for short periods with outdoor temper- cylinder thermostat to about the middle of the section ature ABOVE ZERO: with one line.
COMMISSIONING AND MAINTENANCE 3.6 Cleaning and servicing the boiler REMOVING THE BURNER It is essential to clean the boiler and remove carbon deposits Proceed as follows to remove the burner: from the surfaces of the heat exchanger in order to keep the −...
Page 45
COMMISSIONING AND MAINTENANCE REMOVING THE BLAST TUBE − Make sure that the new nozzle is exactly the same type and size as the old one Proceed as follows to remove the blast tube: − Clean the contact and sealing surfaces −...
COMMISSIONING AND MAINTENANCE CLEANING THE FAN − Remove the burner; − Remove the 2 bottom cover fixing nuts (2); − Remove the 2 top cover fixing nuts (2); Clean the inside and the rotor blades of the fan unit to re- move any build-up of dust.
COMMISSIONING AND MAINTENANCE 3.7.3 Checking and replacing the storage cylinder anode (GITRÈ 5 B/100 model) Proceed as follows to check the condition of the magnesium an- ode: − Remove the top panel (1); − Close the DHW circuit shut-off cock; −...
COMMISSIONING AND MAINTENANCE 3.8 Extraordinary cleaning 3.8.1 Cleaning the storage cylinder ONLY FOR GITRÈ B/100 MODELS Extraordinary cleaning may be required if the performance of the storage cylinder deteriorates or if the water supply is par- ticularly hard. Perform the following operations before beginning any clean- ing: −...
COMMISSIONING AND MAINTENANCE 3.10 Troubleshooting FAULT CAUSE SOLUTION − Check adjustment of burner (perform Burner badly adjusted flue gas analysis) The boiler becomes dirty very quickly Blockage in stack − Clean flue pipes Burner air intake dirty − Clean the burner air intake Boiler dirty −...
Page 50
COMMISSIONING AND MAINTENANCE ONLY FOR GITRÈ B/100 MODELS FAULT CAUSE SOLUTION Storage cylinder safety valve − Check valve setting and efficiency The storage cylinder safety valve keeps Incorrect DHW circuit pressure − Check DHW circuit pressure opening − Check the efficiency of the expansion DHW circuit expansion vessel vessel −...
RECYCLING AND DISPOSAL TROUBLESHOOTING Problem Diagnostic signal Probable cause Remedy Check voltage at L, N and in power plug Check the condition of No electrical power the fuses Check that the safety thermostat has not tripped The burner does not ignite when Eliminate cause of heat is requested The flame detector...