9 SERVICE INTERVAL SUMMARY TABLE:

Regular maintenance will keep the unit running at optimum performance. The values given in the table below are
provided for guidance only. They do not take into account individual factors that can lengthen or shorten the unit's
service life.
DEVICE
Filters
Cooling coil
Electric heater
-Check the connections
(option)
*
-Check the connections
Humidifier (option)
Fan(s)
- Check correct operation
Electrics box
-Check the connections
Hydraulic circuit
-Check correct operation
Water leak detection
sensor and relay
-Check correct operation and
Filter pressostat
setpoint adjustment
Thermostat and fire
-Check correct operation
control relay
-Check circuit for correct
Valve
operation and leaks
-Check the pressure and top up
Pressure gauge
or fill the circuit as necessary
* If a water softener or water treatment system is used, the water hardness should not be less than 40% of the initial
hardness and should never be less than 15°F.
AT COMMISSIONING
2-3 MONTHS
-Replace
-Replace
-Clean
-Check and clean the condensate drains
-Retighten the electrical connections
-Clean
-Check the components
-Retighten the electrical connections
-Check the condition of
-Check the components
the tank; replace if
-Check the condensate drains
necessary
-Make sure that steam is evenly distributed
-Retighten the electrical connections
-Retighten the electrical connections
-Check the components
-Check correct
-Check the components
operation
-Check the insulation
-Check correct operation
-Check correct
Check correct operation and setpoint
operation and setpoint
adjustment
adjustment
-Check correct
-Check correct operation
operation
-Check correct operation
GB-27
12 MONTHS