Husqvarna ST 424 Operator's Manual page 24

Hide thumbs Also See for ST 424:
Table of Contents

Advertisement

Available languages

Available languages

To adjust the left and right
discharge chute cables
1. Put the discharge chute lever in the center
position.
2. Turn the cable adjusters until the discharge chute
points straight forward, and the cables are tight.
3. Loosen the cable adjusters ¼ turn to make the
cables less tight.
To remove the wheels
1. Remove the wheel pin (A) and the retainer pin
(B).
2. Remove the wheel from the axle (C).
A
B
24
To adjust the tension of the
continuous tracks (for ST 424T/
427T/430T only)
Note: Tools that are necessary for this task: a 9/16"
deep socket, a 9/16" wrench and a 5 kg (10 lbs)
weight.
1. Loosen the locking screw (A) 1 turn.
2. Remove the rear locknut (B) to give access to
the adjustment nut.
3. Put a 5 kg (10 lbs) weight (C) on top of the
continuous track, in the center between the 2
wheels.
4. Turn the adjustment nut (B) until the distance (D)
between the continuous track and the steel plate
is between 3.175 and 6.350 mm (0.125 and
0.250 in). wide.
C
5. Attach the locking screw (A) and then the rear
locknut (B).
To clean the product
Clean plastic parts with a clean and dry cloth.
Do not use a high pressure washer to clean the
product.
Do not flush water directly on the motor.
Use a brush to remove leaves, grass and dirt.
B
A
D
C
876 - 003 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

St 427St 430St 424tSt 430tSt 427t

Table of Contents