Bauer CROSS3E Installation And Maintenance Manual page 15

Sliding gates
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 11
7. BATK3 INSTALLATION (fig. 6)
The BATK3 battery kit permits to operate the gate even in case
of mains power failure.
Note: when not in use, batteries are kept charged by means of
the control circuit.
Fit the batteries inside the geared motor and secure by means
of the appropriate support brackets. Connect as shown in the
figure.
The battery control circuit [M] can be snapped on into place
above the cooling fin of the control panel.
8. MAINTENANCE PROGRAM (every 6 months)
Disconnect the power supply and release the gearmotor (see
RELEASE INSTRUCTIONS):
-
Visually check that the gate, the fixing brackets and existing
structure have suitable mechanical strength and are in
good condition.
-
Check the gate-gearmotor alignment, the distance (2-3
mm) between the throat of the pinion, the crest of the rack
and the distance between the rack and rack stop (3 mm)
if present.
-
Clean the wheel's sliding guide, the rack and pinion of the
gear motor and slightly lubricate the rack and pinion of the
gearmotor. Manually check that the gate slides evenly and
without friction.
Connect the power supply and block the gearmotor (see RE-
LEASE INSTRUCTIONS operations):
-
Check that the limit switches are working correctly (the
gate should stop 20 mm before the stop).
-
Check the power adjustment.
-
Check that all control and safety functions are working
correctly.
Attention: For spare parts, see the spares price list.
15
GB
CROSS3E - IP1780

Advertisement

Table of Contents
loading

Table of Contents