General Installation; Leveling Information; Installation Tip - U-Line UHRE518 User Manual & Service Manual

5 class
Table of Contents

Advertisement

USER GUIDE

General Installation

LEVELING INFORMATION

1.
Use a level to
confirm the unit is
level. Level should
be placed along top
edge and side edge
as shown.
1
2.
If the unit is not level, adjust the legs on the corners of
the unit as necessary.
3.
Confirm the unit is level after each adjustment and
repeat the previous steps as needed.

INSTALLATION TIP

If the room floor is higher than the floor in the cutout
opening, adjust the rear legs to achieve a total unit rear
1⁄8
height of
" (3 mm) less than opening's rear height.
Shorten the unit height in the front by adjusting the front
legs. This allows the unit to be gently tipped into the
opening. Readjust the front legs to level the unit after it is
correctly positioned in the opening.
General Installation
Turn to Adjust
INSTALLATION
1.
Plug in the power/electrical cord.
2.
Gently push the unit into position. Be careful not
to entangle the cord or water and drain lines, if
applicable.
3.
Re-check the leveling, from front to back and side to
side. Make any necessary adjustments. The unit's top
surface should be approximately
the countertop.
4.
Install the anti-tip bracket.
5.
Remove interior packing material and wipe out the
inside of the unit with a clean, water-dampened cloth.
11
u-line.com
1⁄8
" (3 mm) below

Advertisement

Table of Contents
loading

Table of Contents