Carbolite MTF 15 Installation, Operation & Maintenance Instructions Manual page 12

900c tube furnace
Table of Contents

Advertisement

MTF 9/15
Upon reassembly ensure that the element wire is deeply embedded in the grooves in the ends of
the insulation and held away from the foil by insulation beads. The foil should be neatly and
firmly wrapped so that it positively locates the beads.
When refixing the wrapped element position the beads just above edge of the metal channel to
maximise the clearance between the outer case and the wires.
6.6
Solid State Relay Replacement
The solid state relay (SSR) fitted to this model is a flat black oblong component with four
numbered wire connections. To replace, simply disconnect the old and fit the new, ensuring that
the numbered connections are made to the correct places.
7.0
12
MF09

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtf 9

Table of Contents