Gas Supply Installation - CHIEF Goldwell CH1015T-NGE/NGEM Installation And Operation Manual

Table of Contents

Advertisement

Before installing heater please verify the following:
1. That the spark plug is gapped at 1/8" (.32cm). If not, gap to 1/8" (.32cm).
2. That the flame probe and spark plug wires are attached.
3. That all bolts, including carriage bolts and screws are tight.
4. The heater is installed on the air discharge end of the fan. Check air flow decals on the fan and heater
to verify heater is oriented properly. Connect the heater to the transition with bolts provided in the
fan bolt bag. The installation should appear as

Gas Supply Installation

Refer to the dryer rating plate to locate the minimum gas supply pressure for obtaining the maximum
gas capacity for which this dryer is specified.
The gas piping installer is to locate a manual emergency shutoff valve in an appropriate location that
allows access to this valve in case of a fire, explosion or other emergency at the heater.
Propane Gas
Chief Industries, Inc. 800-359-7600 INSTALLATION - 416274
C E N T R I F U G A L
illustrated
previously.
H E A T E R
-
C S A
Page 22

Advertisement

Table of Contents
loading

Table of Contents