Heater Location and Foundation

The following illustration shows a typical installation of 2 drying units and optional plenum controls. If
two drying units are used on the same bin, locate them 4' (1.21m) to within 45° of each other and
centered opposite the unloading tube. Locate any humidistat or thermostat control between the two
heater units, making sure control senses heat from both units (order kit #9735035).