Carbolite CAF DIGITAL IMAGING Installation, Operating, & Maintenance Instructions page 43

Coal ash fusion test furnace
Table of Contents

Advertisement

Remove back screws only
before fitting the door arm
assembly to the door slide
shaft.
Door slide shaft
Fig 10a
Adjusting the door arm assembly.
Swing bolts
Door arm
Gas inlets and
safety vent
Rating label
Gas outlet
Test gas flow meters
Fig 11.
Furnace case and controls.
MF36
Instrument switch
Heater lights
Gas selector
switch
Eurotherm controller
Caf Digital Imaging
Door arm assembly.
Loosen front and back
screws to adjust the
door arm assembly
position.
Tube guard
Door assembly
Camera and
standard lens
Camera mounting
bracket
Camera 12V supply
socket
Purge gas fail
warning light
Standby mode
indicator
Test in progress
warning light
Overtemperature
warning light
page 43

Advertisement

Table of Contents
loading

Table of Contents