Summary of Contents for Immergas VICTRIX PRO 35 2ErP
Page 1
VICTRIX PRO Instruction and warning book 35 - 55 2 ErP...
Page 3
Read the following pages carefully: you will be able to draw useful suggestions regarding the correct use of the appliance, the respect of which, will con rm your satisfaction for the Immergas product.
3.8 Converting the boiler to other 1.11 External temperature probe...... 9 2.11 Anti-freeze protection......26 types of gas..........33 1.12 Immergas ue systems......10 2.12 Case cleaning..........26 3.9 Checks following conversion to another 1.13 Tables of equivalent length factors..11 2.13 Decommissioning.
Individual appliance: the distances between access to the rear part. Wall mounting of the The Victrix Pro 35 2ErP is also suitable for any external point of the boiler and the vertical boiler must guarantee stable and e cient sup-...
Victrix Pro 55 2ErP freezing to an ambient temperature of -5°C. (ex: to install 3 Victrix Pro 35 2ErP in cascade, Minimum temperature -15°C. If the boiler is the minimum surface is 350 x 3 = 1050 cm...
Attention: in order not to void the condensation 2H3P Our boilers are designed to operate with natural input of 35 kW (Victrix Pro 35 2ErP in individ- module warranty, before making the boiler con- gas (G20) and L.P.G. Supply pipes must be the...
Attention: Immergas declines all liability in the 1.9 ELECTRIC CONNECTION. • Low temperature system installation. event of damage caused by the inclusion of auto- e operations described below must be performed boiler can directly supply a low temperature matic lling that is not its own brand.
1.10 OPTIONAL BOILER • Zone manager (Fig. 1-6). In addition to the 1.11 EXTERNAL TEMPERATURE PROBE. CONTROLLERS. functions described in the previous point, the e boiler is designed for the application of the e boiler is prepared for the application of a zone manager panel allows to control all the Room ermostat (Fig.
Install the concentric pipe or elbow with the • Positioning of the gaskets (black) for “green range” ue extraction systems. Position the Immergas can supply various solutions for ue- male side (smooth) on the female section ing and air supply.
1.13 TABLES OF EQUIVALENT LENGTH FACTORS. Equivalent length in Equivalent length in DUCT TYPE m of concentric pipe DUCT TYPE metres of pipe 80 Ø 80/125 Ø Concentric pipe 80/125 Ø m 1 Pipe 80 Ø, 1 m Exhaust 1.0 m 1.0 m Concentric bend 90°...
(with lip seals) up to the stop; making sure that input of 35 kW (ex.: Victrix Pro 35 2ErP installed the internal (6) and external wall sealing plates individually) and also for generators with a single (7) have been tted, this will ensure sealing and maximum nominal heat input of 35 kW.
1.15 CONCENTRIC VERTICAL KIT • Maximum length (MAX L) (Fig. 1-13). e kit INSTALLATION. with this con guration can be extended up to Type C configuration, sealed chamber and a max. measurement of 11.5 m with Victrix Pro fan assisted. 35 2ErP and 18.0 m with Victrix Pro 55 2ErP, including the terminal.
1.16 INSTALLATION OF VERTICAL Using the Ø 80 vertical terminal for direct dis- TERMINALS 80 Ø. charge of the combustion products, the terminal Configuration type B, open chamber and must be shortened (see quotas g. 1-16). e wall forced draught. sealing plate (1) must also be inserted in this case going up to stop on the boiler cover.
1.17 INSTALLATION OF 80 Ø HORIZONTAL TERMINALS. Configuration type B, open chamber and forced draught. Ø 80 horizontal kit with wall ue exhaust. Kit assembly (Fig. 1-19): install the 80 Ø bend (1) with the male side (smooth) fully home on the central hole of the boiler.
24.0 m for In particular, for new gas systems: manufacturers instructions. Victrix Pro 35 2ErP and 30.0 m for Victrix Pro - open windows and doors; 55 2ErP. is length is obtained considering Immergas ducting system Ø...
1.24 CIRCULATION PUMP. 1.25 KITS AVAILABLE ON REQUEST. • Hydraulic connection manifolds kit with two e boilers are supplied with a variable speed • Cascade and zones heat adjuster kit. boilers in cascade. circulator pump. • Support kit for xing the heat adjuster to the •...
"R" collection. Whenever the devices and Immergas original kits or uses them generators are not installed in cascade according improperly. to the instructions and the Immergas original...
“annual check and main- tenance of the appliance”. Annual maintenance is essential to validate the conventional warranty of Immergas. We recommend stipulating a yearly cleaning and maintenance contract with your zone Immergas Authorised A er-sales Service.
2.4 CONTROL PANEL. Key: 1 - Main switch 2 - CH temperature adjustment buttons 3 - Sliding door 4 - DHW temperature adjustment buttons (optional) 5 - Boiler manometer 6 - Summer / winter mode button (A) 7 - Reset, info, con rm parameters button (B) 8 - Multifunction button: anomalies records, DHW exclusion (C) 9 - Multi-function display 10 - CH function enabled...
Page 23
• Anomaly records: press and hold “C” down to • Summer ( ): in this mode the boiler only • Stand-by mode ( ): by pressing buttons “A” access the records of the last 8 anomalies that operates for domestic hot water heating. and “C”...
(it may be necessary to wait Press the Reset button (1) probe connection error 3 minutes for the error to be detected). (1) If the block or anomaly persists, contact an authorised company (e.g. Immergas Technical A er-Sales Service).
Page 25
(2) (1) (1) If the block or anomaly persists, contact an authorised company (e.g. Immergas Technical A er-Sales Service). (2) If normal operating conditions are restored, the boiler re-starts without having to be reset. Error...
2.7 INFO MENU. 2.8 BOILER SHUTDOWN. 2.11 ANTI FREEZE PROTECTION. Press and hold down "B" to access the info menu Disconnect the main switch (1) taking it to the e boiler is supplied with an antifreeze function containing all of the various information relative “0”...
BOILER COMMISSIONING - check activation of the safety device in the event - check sealing e ciency of water circuits; of no gas, as well as the relative activation time; INITIAL CHECK - check ventilation and/or aeration of the instal- - check the intervention of the main switch lation room where provided.
3.2 WIRING DIAGRAM. e jumper X40 must be eliminated whenever tion or when the 0 ÷ 10 V inlet is used. For safety reasons the P.C.B. envisions a fuse the room thermostat or cascade regulator are A thermostat can be used instead of “B2” (set that cannot be restored in series with the electric connected.
N.B.: maintenance interventions must be carried to avoid surpassing that value. When this status parameter to the next or by pressing “B”. out by an authorised company (e.g. Immergas is on, the ow temperature symbol ashes. A er-Sales Technical Assistance Service).
Page 31
Programming menu Customised Menu item Description Adjustment range Default value Value P01 Set Risc (CH Set) is de nes the boiler's ow temperature during heating 20 ÷ P02 °C Set risc Max (Max is de nes the maximum settable ow temperature during heating 20 ÷...
Page 32
Programming menu Customised Menu item Description Adjustment range Default value Value 35 kW Met. 20 Velocità Min is de nes the min fan speed and therefore the minimum relative boiler 35 kW LPG 20 ventilatore (Min fan operating power (RPM speed is calculated by multiplying the value displayed 0 ÷...
RATIO. e gas conversion operation must be carried Calibration of minimum CO out by an authorised company (e.g. Immergas Turn the boiler on and start the chimney sweep A er-Sales Technical Assistance Service). functions at minimum output (0%). To have an...
3.14 3 WAY PUMP ANTI BLOCK It is not limited by the “P08” and “P09” param- In order for the system to recognise the two FUNCTION OPTIONAL . eters and does not have priority over the DHW boilers, you must activate the Autodetection and e boiler has a function that starts the pump request.
3.21 YEARLY APPLIANCE CHECK AND MAINTENANCE. e following checks and maintenance should be performed at least once a year. - Clean the ue side of the heat exchanger. - Clean the main burner. - If deposits are detected in the combustion chamber one must remove them and clean the exchanger coils using nylon or sorghum brushes;...
3.22 CASING REMOVAL. - take down the two side panels (12) by removing To facilitate boiler maintenance the casing can the front screws (13) and unhooking the panels be completely removed as follows: (ref. A g. 3-10). - take the two screws out (3) from the bottom of the front (2);...
/ 50 (Ex.: 1000 revs = 20). tained with 0.5 m long intake/exhaust pipe. - Burner pressure values refer to use of gas at 15°C. 3.24 COMBUSTION PARAMETERS. Victrix PRO 35 2ErP Gas nozzle diameter 10.5 Supply pressure mbar (mm c.a.)
3.26 KEY FOR DATA PLATE. Cod. Md Sr N° Cod. PIN Type n min. max. n min. n max. Class CONDENSING N.B.: the technical data is provided on the data plate on the boiler Model Cod. Md Model code Sr N° Serial Number Check Cod.
Contact information IMMERGAS S.p.A. VIA CISA LIGURE, 95 - 42041 BRESCELLO (RE) ITALY (*) High temperature mode means 60°C on return and 80°C on ow. (**) Low temperature mode for condensation Boilers means 30°C , for low temperature boilers 37°C and for other appliances 50°C of return temper- ature.
3.28 PRODUCT DATA SHEET IN COMPLIANCE WITH REGULATION 811/2013 . Victrix Pro 35 2 ErP Victrix Pro 55 2 ErP VICTRIX PRO 35 2ErP VICTRIX PRO 55 2ErP Parameter value Parameter value Yearly energy consumption for the heating Yearly energy consumption for the heating 59.4 GJ...
3.29 PARAMETERS FOR FILLING IN e remaining values must be obtained from THE ASSEMBLY SHEET. the technical data sheets of the products used In case you should wish to install an assembly, to make up the assembly (e.g. solar devices, in- starting from the Victrix Pro 35-55 2ErP boiler, tegration heat pumps, temperature controllers).
Page 45
Parameters for lling in the assembly chart. Parameter Victrix Pro 35 2ErP Victrix Pro 55 2ErP ‘I’ ‘II’ ‘III’ 0,79 0,53 ‘IV’ 0,31 0,21 * to be established by means of table 5 of Regulation 811/2013 in case of “assembly” including a heat pump to integrate the boiler.
Page 46
Example to ll in the domestic hot water production system assembly chart. 3-14...
Page 47
Parameters for lling in DHW package assembly chart. Parameter Victrix Pro 35 2ErP Victrix Pro 55 2ErP ‘I’ ‘II’ ‘III’ * to be determined according to Regulation 811/2014 and transient calculation methods as per Notice of the European Community no. 207/2014.
Page 48
Follow us Immergas Italia immergas.com Immergas S.p.A. 42041 Brescello (RE) - Italy Tel. 0522.689011 Fax 0522.680617 Certi ed company ISO 9001...
Need help?
Do you have a question about the VICTRIX PRO 35 2ErP and is the answer not in the manual?
Questions and answers