Assembly Of The Evaporation Unit - Viessmann CS 900 Assembly Manual

Split refrigeration units
Table of Contents

Advertisement

2.2

Assembly of the evaporation unit

The evaporator is assembled within the coldroom on the
ceiling.
Using the two drawings 2.2.1 and 2.2.2 four holes are drilled
on the ceiling.
Cut edges should be rust proofed.
Anchor evaporation unit with enclosed plastic scres on the
U-profiles on the coldroom ceiling.
2.2.1 Drilling diagram for large evaporation unit
(CS 2000, CS 2800, FS 1400, FS 1800, FS 2400)
Distance to wall 140 mm for wall thickness 150 mm.
Distance to wall 230 mm for wall thickness 60 mm.
2.2.2 Drilling diagram for small evaporation unit
(CS 0900, CS 1300, FS 0900)
Distance to wall 165 mm for wall thickness 150 mm.
Distance to wall 255 mm for wall thickness 60 mm.
General notice (liability): the details of this technical documents serve for description. Consents regarding the availability of certain features or
regarding a certain purpose always require a special written agreement.
Page No. 5237324-06 GB
2.2 - 2.2.2
Exhaust vent
Suction vent
Exhaust vent
Suctionvent
Right reserved to make technical changes!
GB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs 1300Cs 2000Cs 2800Fs 900Fs 1400Fs 1800 ... Show all

Table of Contents