Operating Instructions; Operating Sequence - Cambridge Engineering S Series Technical Manual

Direct gas-fired industrial blow-thru space heater
Table of Contents

Advertisement

OPERATING INSTRUCTIONS

OPERATING SEQUENCE

POWER ON
1. Control transformer energized.
2. Operator must select "SUMMER
VENTILATION" or "HEATING" mode.
SUMMER VENTILATION MODE
1. Mode switch in "SUMMER VENTILATION"
position.
2. Optional TSS Controller schedule calls for
ventilation.
3. Optional motorized damper opens.
4. Blower motor starts.
5. Unit continues to run until turned off.
HEATING MODE
1. Mode switch in "HEATING" position.
2. Thermostat or interlock calls for heat.
3. Optional motorized damper opens.
4. Blower motor starts.
5. Airflow switch closes.
6. Entering air thermostat closes when inlet temper-
ature is below setpoint after the prepurge delay.
7. Igniter warm up timing.
8. Gas valve opens.
9. Burner lights.
10. Igniter is de-energized.
11. Low Fire Start is de-energized after 15 seconds.
12. Unit runs and modulates until operating thermo-
stat and/or interlock opens (heater shuts off).
13. Steps (2) through (12) repeat themselves auto-
matically as necessary.
Cambridge Engineering, Inc.
32
S-Series Technical Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S400S800S950S1600S1850S3200 ... Show all

Table of Contents