CELLYTE 6-12TSG STATIONARY Gel BATTERIES Fitted with Catalyst INSTALLATION and OPERATING INSTRUCTIONS Supplied Worldwide by : SEC Industrial Battery Co. Last Revised May 2011...
Electrical shock or burns, acid burns and fire can operating batteries; contact SEC if there are result if proper safety precautions are not followed. any questions regarding gassing or ventilation. The following precautions apply to all battery Electrical Shock installation and maintenance work.
SECTION 4 - STORAGE Maintaining temperature balance across the string General is very important for maximum battery life. difference between the maximum and minimum Do not store batteries outside, exposed to the block temperature in a series string can be no more elements.
be the sum of the batteries, rack or cabinet plus CAUTION: Remove all rings and watches before 5%for the battery connectors. It is the responsibility installing the connectors on the batteries. of the installer to ensure adequate floor load Ensure that all tools are insulated with vinyl carrying capabilities.
The voltage drops should match will be from 2.35 vpc to 2.45 vpc or higher if only within 10%. very short recharge time. Please contact SEC for more site specific charging information. SECTION 6 - OPERATION Initial Charge...
Float Voltage Recharge The float voltage is sometimes known as the Recharge batteries immediately or as soon as continuous charge voltage. It is very important that possible after a discharge. Do not wait more than it be calculated and set properly for maximum 24 hours to initiate the recharge after the batteries battery life and performance.
Section 8 - MAINTENANCE AND RECORD KEEPING SECTION 9 - CAPACITY TESTING Maintenance and record keeping is critical to battery life and warranty continuance. Proper General maintenance will ensure that the batteries are being correctly used and will be available when Discharge testing of the battery is performed to needed.
where CF is the capacity Correction Factor for (10) Stop the timer and remove the load from the temperature. battery. The following table should be used : (11) Recharge the battery using the existing charger or an external charger. An equalize voltage may be Test Temperature Capacity Correction used to reduce charge time.
11 TECHNICAL SUPPORT SEC is always ready to assist you in your installation operation CELLYTE 6-12TSG batteries. If you have any questions on any portion of this manual, please do not hesitate to call or fax any of our offices listed below and request assistance.
Need help?