SEC CELLYTE 6-12TLA Installation And Operating Instructions Manual

Stationary agm batteries

Advertisement

Quick Links

CELLYTE 6-12TLA
STATIONARY AGM BATTERIES
INSTALLATION and OPERATING
INSTRUCTIONS
NON-SPILLABLE by DOT
(Department of Transportation)
ICAO (International Commercial Airline Organization)
and IATA (International Airline Transport Assocaiation)
Supplied Worldwide by :
SEC Industrial Battery Co.
Last Revised May 2011
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CELLYTE 6-12TLA and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SEC CELLYTE 6-12TLA

  • Page 1 CELLYTE 6-12TLA STATIONARY AGM BATTERIES INSTALLATION and OPERATING INSTRUCTIONS NON-SPILLABLE by DOT (Department of Transportation) ICAO (International Commercial Airline Organization) and IATA (International Airline Transport Assocaiation) Supplied Worldwide by : SEC Industrial Battery Co. Last Revised May 2011...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS SECTION CONTENT PAGE SECTION CONTENT PAGE GENERAL INFORMATION Electrical Connections Battery Characteristics 5.5.1 Cabling recommendations 5.5.2 Terminal Preparation 5.5.3 Connector Installation SAFETY INFORMATION 5.5.4 Voltage Checks General Information 5.5.5 Battery to Charger Connection Sulphuric Acid 5.5.6 Paralleling of Batteries Gassing Electrical Shock OPERATION...
  • Page 3: General Information

    SECTION 3 - RECEIPT OF EQUIPMENT Sulphuric Acid Delivery Inspection The CELLYTE 6-12TLA Bloc is a lead acid battery and Immediately upon delivery, inspect the batteries for contains Sulphuric acid in diluted form. Because the damage caused in transit. Damaged pallets or packing...
  • Page 4: Storage

    8ºC rise in battery temperature above 20 ºC, the life of 5.1.4 Floor Loading the battery will be cut in half. For example, the CELLYTE 6-12TLA Bloc battery is designed for a 10 Before installing batteries, should year float service life at 20ºC.
  • Page 5: Installation - Cabinets

    5.5.1 Battery ratings are specified at the terminals of the battery. The cabling used to connect the battery CELLYTE 6-12TLA Bloc batteries are capable of with standing seismic events of UBC Zone 4 magnitude when terminals to the load has a voltage drop (when the properly installed in a suitably designed cabinet or rack.
  • Page 6: Voltage Checks

    At voltages below 2.29 VPC adequate equalization will the string voltage. If the recalculated and measured not be obtained. Contact your SEC representative for string voltages do not match reasonably well, contact additional details on procedures to equalize a battery your SEC representative for further instructions.
  • Page 7: Maximum Charge Current

    Section 6.1 for methods to battery life. compensate. The maximum charge currents are : Maximum Charge Rates for CELLYTE 6-12TLA Bloc Section 7 - STORAGE TYPE AMPS 6TLA-130 21.1...
  • Page 8: General Records

    The service test is usually performed by placing the 8.2 General Records actual load on the battery and determining the actual time the battery will support the load. This test is done, 8.2.1 Installation Records in the case of a UPS, by switching into a test mode where the battery becomes the primary source and the When the battery is first received, record: normal AC line becomes the back-up.
  • Page 9: Discharge Test Notes

    (8) Record the load current, string and individual cell voltages on a regular basis. A minimum of three sets of readings should be taken. The time interval between sets of readings will vary based on the expected test time. For example, take readings every hour for the first 4 hours of an 8 hour rating test.
  • Page 10: Battery Maintenance Register

    SEC BATTERY MAINTENANCE REGISTER Maintenance Description Date Industrial Battery Co. Industrial Battery Co.
  • Page 11: Technical Support

    11 TECHNICAL SUPPORT SEC is always ready to assist you in your installation and operation of SEC CELLYTE 6- 12TLA batteries. If you have any questions on any portion of this manual, please do not hesitate to call or fax any of our offices listed below and request assistance.
  • Page 12: Battery Report

    SEC BATTERY REPORT Installed by: Representative: Operating Company: Date: Time: Address/Location: Battery Information Type of Battery: No. of Cells/String: String Float Voltage: Installation Date: No. of Strings/Battery: Float Voltage/ Cell: Battery Charge Current: Battery Code: Float Current: Charging Equipment: Ambient Temperature:...