Download Print this page

Holm nBeckon-26 Installation Notes page 3

Advertisement

INSTALLATION NOTES:
3. Product Installation (continued)
Side View
36–42"
(0.9-1 m)
Cable
Bell-Shaped Hole
Bell-Shaped Hole
1. Excavate a 20" (508 mm) diameter hole in the
desired location.
2. Run conduit or cabling at least 3" (76 mm)
deeper than the bottom of the construction
sleeve ("sleeve").
3. Choose the ideal knockout(s) to attach conduit
or install cabling and use a tool of choice to
forcefully remove the knockout.
4. For conduit, connect to sleeve with couplings of
choice (½"-14 NPT). For cabling, install with cord
glands and torque to 50 in-lbs (5.6 Nm).
5. Remove the wiring compartment cover and pull
the wiring into the sleeve. Leave the cover inside
the sleeve to prevent loss.
6. Add installation cover onto sleeve using the
provided fasteners.
ARCHITECTURAL & LANDSCAPE LIGHTING
nBeckon-
26
Side View
Conduit
7. Insert a piece of 2" x 4" (50 mm x 100 mm)
8. Build a wooden frame to align and secure the
9. Ensure the wooden frame aligns the top of the
|
holmlighting.com
lumber with a length in excess of the excavated
area into the cover's slot. Secure with metal
fasteners (not provided).
construction sleeve during the concrete pour.
cover with grade for a flush installation. To install
the faceplate slightly above grade, raise the
frame no more than ⅜" (10 mm).
Top View
2" x 4" (50 mm x 100 mm)
Lumber
Customer Service 1-844-200-4656
3

Advertisement

loading