Assembly instructions
Step 3
A). Insert the Foam Roll Tube(#6) into the hole on the top of the Incline Adjust Tube(#3) with half way,
attach two Foam Rolls (#4) from each side of the Foam Roll Tube(#6).
from each side of the Lower Protection Holder Tube(#5).
B) When finish workout, pull out the Lock Pin(#8), then fold up the Front T shape Stabilizer(#7) and
locked with Lock Pin(#8), the unit can be folded for storage to save space.
7
Attach two Foam Rolls (#4)
Need help?
Do you have a question about the SIT UP BENCH and is the answer not in the manual?