Download Print this page

Celec 98MDC Manual

Mdi-controller

Advertisement

Quick Links

MDI-CONTROLLER
98MDC
RD
KW
DATE
MONTH
MD
KVA
TIME
HOURS
RD
KW
MD
KVA
98MDC
INSTALLATION GUIDELINES
1. Prepare the panel cutout with proper dimensions as shown in specifications.
2. Remove the clamp from the controller.
3. Push the controller into the panel cutout. Secure the controller in its place by pushing the clamp on the rear side. The screws, of the
panel of the clamp, must be in the furthest forward slot.
4. For proper sealing, tighten the screws evenly with required torque.
SAFETY SUMMARY
This manual is meant for the personnel involved in wiring, installation, operation and routine maintenance of the equipment.All safety related
codifications; symbols and instructions that appear in this operating manual or on the equipment must be strictly followed to ensure the
safety of the operating personnel as well as the instrument.
If the equipment is not handled in a manner specified by the manufacturer it might impair the protection provided by the equipment.
Caution:
1.
Read complete instructions prior to installation and operation of the unit.
1. The equipment shall not be installed in environmental conditions other than those specified in this manual.
2. Fuse protection-The equipment does not contain built-in-fuse. Installation of external fuse for electrical circuitry is highly
recommended. Recommended rating of such fuse shall be 275VAC/1A.
3. Since this is a built-in-type equipment (finds place in main control panel), its output terminals get connected to host equipment.
Such equipment shall also comply with basic EMI/EMC and safety requirements like BS EN 61326-1 and BS EN 61010
respectively.
4. The output terminals shall be strictly loaded to the manufacturer specified values/range.
METHOD OF MD CALCULATION
At the end of each fixed integrations Period average power for that period is calculated.
Assume a load pattern of the following type-
20KW
30KW
30KW
15 Mins
10:00
10:15 10:30
DEMAND CONTROLLER
R
Y
B
DATE
PROG.
AL-1
AL-2
TRIP
MINUTES
D
E
S
ATE
NTER
CROL
MENU
T
A
T
LARM
RIP
IME
-RESET-
Program before use
20KW
10:45
11:00
SPECIFICATION:
1. Voltage
2. Auxiliary Voltage
3. Current Path
4. Frequency
5. Display Size
6. Setting
a) Maximum Demand : Programmable 10 to 9000KW/KVA
b) Integration Time
c) Primary CT
d) Weekly Power Cut
e) Parameters
7. Programming Lock
8. Display Parameters
9. Output
10. Dimensions
11. Bezel/Panel Cut Out
12. Environment
Integration period is 30 minutes then
Demand (RD)- 10:00 to 10:30 block= (20*15+30*15)/30=25kW
Demand (RD) - 10:30 to 11:00 block= (30*15+20*15)/30=25kW
Demand
- at the end of 11:00 = 25kW
General
:
0 to 500VAC (Line to Line)
0 to 280VAC (Line to Neutral)
:
230VAC (+/-10%)
:
Secondary CT 5 Amp.
:
45Hz to 65Hz
:
0.56"
: Programmable 5 or 30 Minute
: Programmable Upto 9000Amp.
: Programmable weekly power cut
Time
:
:
Available
:
RD+MD, KW+KVA and Time+Date
: 3 Relays output 7 Amp. 230VAC
,
,
:
96mm (W) x 96mm (H) x 100mm (D)
: 90mm x 90mm
: Operation Temperature - 10 C to 60 C
Humidity Max 95% (Non Condensing)
o
o
1

Advertisement

loading

Summary of Contents for Celec 98MDC

  • Page 1 MDI-CONTROLLER General 98MDC SPECIFICATION: 1. Voltage 0 to 500VAC (Line to Line) 0 to 280VAC (Line to Neutral) 2. Auxiliary Voltage 230VAC (+/-10%) 3. Current Path Secondary CT 5 Amp. DEMAND CONTROLLER 4. Frequency 45Hz to 65Hz 5. Display Size 0.56”...
  • Page 2: Display & Indications

    MDI-CONTROLLER Display & Wiring Diagram 98MDC DISPLAY & INDICATIONS 6. MD LED Indicate Display 2 show Target demand of present Time Tarif (Maximum Demand) Indication 7. KVA LED Indicate display 2 shows Instantaneous KVA (Apparent MDI-CONTROLLER power) 8. Time LED indicate Display 2 shows Present time (24 Hour Format).
  • Page 3 MDI-CONTROLLER User Manual 98MDC GENERAL WORKING 1. Display Rising Demand & Maximum Demand / KVA / Clock Press Key Display shows Maximum (Target) Demand (MD) and Rising Demand (RD). Press Key Display show s Rising Demand (RD) and running load (in kVA)
  • Page 4: Controller Programming

    MDI-CONTROLLER User Manual 98MDC CONTROLLER PROGRAMMING 1 Start Programming mode Press key, display show internal clock time and Date. Press key, Peak time LED glows and Display shows Peak load On/Off period for present month. - Lock and Unlock the program...
  • Page 5 MDI-CONTROLLER User Manual 98MDC - To set Alarm1 percentage Again press key, Display shows Alarm1 energizes when kW More than Set MD. Example:- If user set target demand at 160 kW and AL1 is at 110 Then over load limit will be 160x110/100 = 176 kW As the running load exceeds 176 Alarm1 will be ON.
  • Page 6 MDI-CONTROLLER User Manual 98MDC Example:- Say energy meter kW =110 Controller kW = 100 Energy Meter kW Calibration Number x100 Controller kW x 100 Calibration Number = 110 Reason for mismatching can be transformer and C.T.’s, P .T.’s variation. Again press...
  • Page 7 MDI-CONTROLLER User Manual 98MDC - To set peak load on time March Again press key, Display shows set the March peak load on time. key and key to change the peak load time. key to enter change HH : MM...
  • Page 8 MDI-CONTROLLER User Manual 98MDC - To set peak load on time August Again press key, Display shows set the August peak load on time. key and key to change the peak load time. key to enter change HH : MM...
  • Page 9 MDI-CONTROLLER User Manual 98MDC - Clock and Calender Setting Again press key, if Display shows ,device is locked but operator can view the clock and calender. If Display shows , device is unlocked operator can modify the clock and calender.