ES-15 Field Installation Manual INDEX Important Instructions……………………………………………………………… Product Specifications…………………………………………………..…………. Unpacking & Mounting …………………………………………………………… Connection Type 1 ……………………………………………………………..…… Connection Diagram............... 6 Connection Type 2 ……………………………..……………………………… Connection Type 3 ……………………………………………………….…………. Electrical Data Sheet ………………………………………..…………………….. Recommended Part List………………………………………………..…..…….. ______________________________________________________________________________________...
Any warning provided by Celec must be passed through to the end user. Celec offers a warranty only as to the quality of its product to confirm to the catalog specifications. No other warranty is offered. Celec assumes no liability for any personal injury, property damage, losses or claims arising out of the misapplication and Non performance of its products.
CAUTION Indoor Use Only, Type-1 Enclosure. 1. Choose the dry and Clean Wall to Install the ES-15 taking care conduit connections from Bottom side Enclosure Size is 500 x 500 x 210 mm and weight 28kg (62 Pounds). 2. Premark the Mounting holes on wall or structure.
Main Breaker Panel. 1.1 Power Connections 1.11 Switch off the external handle of load break switch (LBS), using panel key open the door of ES-15 exposing connections. 1.12 Locate Earth Terminal in ES-15, connect the earth wire to ES-15 Earth Terminal. Connect the other side of earth wire to main breaker panel ground rod.
ES-15 units should be mounted with four appropriate sized fasteners before connect to Main Breaker Panel. 1. Switch off the external handle of load break switch (LBS), using panel key open the door of ES-15 exposing connections. 2. Remove existing 3 Pole breaker blanks and install new 3 Pole 60 Amp circuit Breakers.
2. Wire in rigid conduit between customer main breaker panel & external disconnect switch. Connect to ES-15 using 3/4‘’conduit. 3. Locate earth ground connection in ES-15 and connect to grounding bar or to earth ground rod in main breaker panel.
ES-15 Field Installation Manual Electrical Data Sheet Model ES-15 Phase Configuration Three Phase 120/208V AC WYE/Delta Maximum Line Voltage 208V AC Maximum Power 15 kVar Steps Monitoring PF, kVA, kVar, Volt, Current, KW, %THD-V Internal Temperature & Capacitor Status Accuracy 0.333 kVar each Phase, 1 Kvar three Phase...
Installation of material and workmanship at the customer’s Main Breaker Panel shall be the responsibility of the qualified Electrician in accordance with NEC. Any and all connections exterior to the ES-15 unit shall be the responsibility of the qualified Electrician. ______________________________________________________________________________________...