Power Meter And Sensor Cable Requirements; Interconnections; Calibration - Agilent Technologies E Series Operating And Service Manual

Errata, peak and average power sensors
Hide thumbs Also See for E Series:
Table of Contents

Advertisement

e9321_90001.book Page 11 Tuesday, March 18, 2003 10:44 AM
General Information
Power Meter and Sensor Cable
Requirements
The E-series E9320 power sensors are compatible ONLY with
the EPM-P series power meters and with E9288 sensor
cables. (The E9288 cables are color coded to help distinguish
them from the 11730 series cables.)

Interconnections

Connect one end of an E9288 sensor cable to the E-series
E9320 power sensor and connect the other end of the cable to
the power meter's channel input. Allow a few seconds for the
power meter to download the data contained in the power
sensor.
Ensure power sensors and cables are attached and removed
in an indoor environment.

Calibration

To carry out a zero and calibration cycle as requested by the
power meter proceed as follows:
Ensure the E-series E9320 power sensor is disconnected
from any signal source. On the power meter, press
Zero
Cal
the wait symbol is displayed.
When the wait period is complete connect the E-series E9320
power sensor to the power meter's POWER REF output.
Press
again displayed during calibration.
T IP
You can reduce the steps required to carry out the zero and
calibration procedure as follows:
E-Series E9320 Operating and Service Guide
,
(or
/
Zero
Zero A
Zero B
(or
,
/
Cal
Cal Cal A
Cal B
). During zeroing
). The wait symbol is
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E9320E9323aE9321aE9325aE9326aE9327a ... Show all

Table of Contents