Machine Operation; Starting The Machine; Erecting A Case - Pro Mach Wexxar BEL Series Operation & Service Manual

Semi-automatic case former and packing station
Table of Contents

Advertisement

B E L 5 0 5 / 5 0 5 S S
Additional Note: For wide cases on 18" & 20" maximum width 505 versions, optional roller wheels are
mounted on extensions from the folding plates to place them closer to the centre of the box for better folding
performance and product support. Extensions may need to be removed for narrow cases run on the same
machine to avoid interference with other machine components. If your application requires these extensions and
they are not provided with your machine, contact BELCOR for information and parts.
M
O
ACHINE
PERATION
Make sure that the main on/off valve at the air connection is shut off and that the
red emergency stop button is pushed down before connecting an air supply to the machine.
S
M
TARTING THE
ACHINE
Prior to starting, hand swing all moving parts to check adjustment and for any mechanical
interference. Turn on main supply valve, keeping hands clear of moving parts.
E
C
RECTING A
ASE
1. Open a case so that it is fairly square.
2. Place the open bottom into the BEL
505 or 505 'S', pushing the case all
the way down to the floor switches
3. The machine will first fold the front
and rear end minor flaps, then the two
side major flaps. The case is held in
place and is ready to fill, if desired
4.
When filled, or if the case is just
erected for filling downstream, push
it out of the packing station to the
.
next operation
5. As the end of the case breaks contact
with the "body" switch, the 505 will
automatically reset ready for the next
case.
65-11-7 2/5/2007
- A
E M I
U T O M A T I C
S
A
F
E
T
Y
S
A
F
E
T
Y
C
F
& P
A S E
O R M E R
C
A
U
T
I
O
N
C
A
U
T
I
O
N
S
A C K
T A T I O N
1 1

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Pro Mach Wexxar BEL Series

This manual is also suitable for:

Wexxar bel 505Wexxar bel 505s

Table of Contents