To close a valve:
 
Select the valve by touching the screen.
 
 
When leak testing is complete, press
"CANCEL" to return to the Main Menu.
 
NOTE: Any valves left in open position will be closed automatically.
 
From the Main Menu screen, press
"LOGOUT" to return to normal display.
MNL000460.doc
Extreme care must be taken when operating
valves manually. Only those valves required
for adequate leak testing should be opened.