Commissioning - Bego Otoflash Operating Instructions Manual

Table of Contents

Advertisement

English ⋅ Otoflash
en

Commissioning

Before commissioning, set the device to the correct input voltage using the selector switch (12) on the back
of the device.
When moving the device from colder to warmer ambient temperatures (e.g. transport in the winter), allow it
to acclimatize for a minimum of 2 hours (to prevent the risk of flashovers inside the device).
1
2
3
Fig. 2
Front side
9
Fig. 3
Rear side
24
8
4
5
6 7
11
10
12
13 14
1.
Power switch (mains switch)
2.
Protective gas switch
3.
Protective gas indicator lights
4.
Display with keypad
5.
Start button
6.
Lamp indicator lights
7.
Ready indicator
8.
Polymerization chamber
9.
Fan
10. Protective gas connection
11. Type plate
12. Selector switch (100, 115, 230 V)
13. Mains socket with fuse
14. Operating hour meter
Holding trays:
2 Plexi trays with UVB blockers are available,
labelled 360N2.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents