Daily verification of operation is the key to continued operation of the CHC system.
Each Day the following should be verified:
Operational pressure of the Pump(s)
Operational differential pressures of the Filtration system.
Functionality of the Filter's Back Wash ability.
Review of Control Station Messages
Visual system check for water leaks, water clarity, water smell
Every Quarter the following should be verified:
Calibration of Conductivity Meter
Pump Amperage Verification
Every Six Months the following should be conducted:
Lubrication of Motors and O-Rings
As needed the following should be conducted:
Cleaning of Basket Strainers (The frequency of cleaning will depend upon the amount of
debris in the system. Upon Start Up the baskets should be cleaned at least three times a
day for the first week, and then cleaned as needed depending upon debris level.)
The use of the CHC Treatment system is in no way intended, to replace or diminish your required service
as specified by the manufacturer of your tower or heat exchanger. Please refer to the appropriate manuals
and continue the required maintenance as specified therein. The lack of appropriate system maintenance
may result in the premature failure of our cooling system.
All cooling systems require appropriate, timely service. It is your responsibility to make sure these
service requirements are met to ensure appropriate system operation.
STANDARD SERVICE REQUIREMENTS
CAUTION
8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CHC and is the answer not in the manual?

Questions and answers

Table of Contents