35.
Complete the Installation Certificate and have it signed by the customer.
36.
Conduct all required training sessions for the local EcoWater CHC representative as well as
any service personnel specified by the customer. (Pass out and discuss Operation Manual,
Instruct Personnel on Service Requirements, Instruct Personnel on required troubleshooting as
shown in manual. ( This section normally takes 1 hr per training session. Verify that all
customer personnel requiring training are given a class, some personnel may require training
for multiple shifts, consult customer.)
37.
Take good pictures of the current condition of the tower, any tubes or piping that would be
good for our records.
Things to check in the CHCCS Settings:
Language and units are correctly selected
Contact phone number is correctly shown on the screen.
The selection of filter type is correct (normally set to Sep/Auto)
The Sep settings should normally be 18 seconds Open and 3-6 hours Closed (if the tower is dirty
select on off time of three hours while if the basin is clean, select the 6 hours setting)
The Auto Screen Settings should be 13-16 seconds Rinse time, 300 seconds Delay, and 60-360
Auto, 60 if the tower is extremely dirty and 360 if it is clean with little debris.
The Trip pressure is set 8 psi below the normal operating pressure as shown on the screen, unless
otherwise specified.
Power Saver should be OFF unless required.
Safety Valve should be OFF unless required.
All Calibrations correctly entered
The blow down set points and duty cycle settings are correct as specified.
The User Defaults are saved.
Enter Passcode 2000 to clear the back wash counts on the screen
Make sure a formatted micro SD card is installed on the PLC
You have taken a picture of hidden screen #2.
If you have any questions, contact the EcoWater CHC Engineering Department (210)-910-6463.