PUREGAS, LLC
CAUTION!
Proper Installation & Maintenance as outlined in this User's Guide is
extremely important to ensure the reliability and longevity of the
equipment as well as prevent damage or personal injury.
CAUTION!
Depressurizing the air Dryer may be necessary before performing
certain procedures. NEVER remove pressure sensing tubes from the
Control Board without depressurizing the air Dryer first, or damage to
the Control Board will occur.
CAUTION!
Incoming power to Dryer must be:
IMPORTANT!
Performing routine maintenance as outlined in the Maintaining Your
Dryer section will ensure optimal performance over the lifecycle of
your air Dryer.
IMPORTANT!
Performing procedures not described in this User's Guide or installing
components not supplied by PUREGAS is NOT RECOMMENDED
AND MAY VOID THE WARRANTY.
• 15 amp service recommended
• 10 amp slow blow fuse
• 110 - 125 VAC, 50/60 Hz for P550W models
• 208 - 253 VAC, 50/60 Hz,
Page 7 of 99
P550W Series Air Dryers User's Guide
for P552W models
1 Phase
P011658 – Rev. P
Need help?
Do you have a question about the P550W Series and is the answer not in the manual?