Commissioning And Adjustment - Viessmann Vitomax HS Series Installation Instructions Manual

High pressure steam boiler
Table of Contents

Advertisement

Installing the burner
CE
Fig. 11
a Max. flame head diameter
b Clearance
1. Using screws, secure the burner plate
burner connection to the boiler flange.
2. Secure the burner to the burner plate with screws.
Note
For different dimensions, trim the cut-out in the
thermal insulation according to the flame head
diameter.

Commissioning and adjustment

Boiler operating and service instructions and
separate documentation
22
(cont.)
for
B
3. If necessary, fill annular gap
head and thermal insulation
filler material (standard delivery).
Note
Thermal insulation blocks and loose thermal insu-
lation are supplied either inside the reversing
chambers of the boiler doors or inside the flame
tube.
4. Close the boiler doors and cleaning aperture at the
back of the boiler.
Note
Check for gas tightness.
Installation information "Insulation for burner
entry point"
Burner operating and service instructions
Connection and wiring diagrams
between burner
E
with heat-resistant
C