Waeco AirConServiceCenter ASC5100G Operating Manual page 89

Air conditioning service unit
Hide thumbs Also See for AirConServiceCenter ASC5100G:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 54
ASC5100G
8.7.3
Filling process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Filling phase" has been selected, enter the required value, oth-
erwise continue with chapter "Selecting connections" on page 90.
3. Enter the amount of refrigerant oil which was previously drained or
which is required.
4. Press the cursor key .
5. Enter the refrigerant quantity.
6. Press ENTER to confirm all settings.
I
NOTE
 If extraction is taking place in the same process sequence, the quan-
tity of fresh oil is counted as an additional filling quantity, and is
added to the drained oil quantity extracted beforehand. If this value
is set to 0, exactly the quantity of oil which was extracted will be filled
again.
 To add fresh oil, a vacuum process must be performed in the same
process sequence. If no vacuum process has been selected, only
refrigerant can be selected in the filling menu.
EN
Filling phase?
ENTER-OK STOP-EXIT
PAG oil
UV tracer
Refrigerant
ENTER-OK STOP-EXIT
Yes
No
ml.
0
ml.
0
g.
500
Operation
89

Advertisement

Table of Contents
loading

Table of Contents