Replacing the measuring system

7 Replacing the measuring system
The following points must be noted when replacing the measuring system:
The new measuring system must have the same item number as the system
being replaced. Any deviations from this must be cleared with Pilz.
You must ensure that the count direction set via hardware switches on the new
measuring system matches the previous count direction.
The new measuring system must be installed in accordance with the
specifications and requirements stated in the chapter entitled "Assembly".
The new measuring system must be connected in accordance with the
specifications stated in the chapter entitled "Connection/Shield connection".
When recommissioning the replaced measuring system, a protected test run must
be carried out to ensure the system functions correctly.