System Start Up - Rain Soft Hydrefiner II Owner's Manual

Premium drinking water system
Table of Contents

Advertisement

INLET 3/8 TUBE INSTALLATION
Figure 6

System Start Up

1. Turn on the Cold Water Supply
• Allow water to enter the system and let it stand for 5 minutes.
2. Check for Leaks
• If a leak is present, make the necessary repairs.
3. Flush the System
• Open the new faucet and allow the water to flow for 10 minutes.
This process will flush the disinfectant and carbon fines from the
system.
4. Cover Assembly
• Place Cover onto Hydrefiner II and ensure tubing is correctly
secure. (See Figure 7)
Figure 7
6
OUTLET 3/8 TUBE INSTALLATION
FLOW
RESTRICTOR

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Hydrefiner II and is the answer not in the manual?

Table of Contents

Save PDF