Advertisement

C U T WAT E R 3 0
OWNER S MA NUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 30 and is the answer not in the manual?

Questions and answers

Summary of Contents for Cutwater 30

  • Page 1 C U T WAT E R 3 0 OWNER S MA NUAL...
  • Page 2: Table Of Contents

    Bilge Pump System ....................27 Waste System ......................28 Mast Set Up And Takedown .................. 29 Cutwater 30 Wiring Schematic (Acc. 1) ..............30 Cutwater 30 Wiring Schematic (Acc. 2) ..............31 Cutwater 30 Wiring Schematic (Acc. 3) ..............32 Cutwater 30 Wiring Schematic (Lighting) ..............
  • Page 3: Congratulations

    SAFETY Safety is always a concern at Cutwater. Please read all manuals to ensure that equip- ment is used in a safe manner. We highly recommend attendance in a Coast Guard approved boating safety course. Such courses are available from the Coast Guard directly or from boating organizations.
  • Page 4: Symbol Glossary

    SYMBOL GLOSSARY  Attention! – Important Operating or Maintenance Instructions  Attention! – Electrical Shock Hazard Fresh Water Black Water Fuel Standard Equipment Optional Equipment  Hints...
  • Page 5: Specifications (Subject To Change Without Notice)

    SPECIFICATIONS LOA molded ..................30’ - 0” 9.14 m LOA rigged (with swim platform & pulpit) ........34’ – 4” 10.46 m Bridge clearance (mast folded) ............9’ - 9” 2.97 m Height on trailer ................13’ - 2” 4.01 m Beam .....................10’ - 0”...
  • Page 6: Equipment Location

    EQUIPMENT LOCATION STARBOARD FITTINGS 1 2 3 4 5 6 7 8 10 11 Keep all vents, drains and exhausts clear of any obstructions to ensure proper performance of each system. ➓ ➐ ➍ ➏ ➎ ➒ ➑ ➊ ➋ ➌...
  • Page 7: Port Fittings

    PORT FITTINGS 1 2 3 5 6 7 9 10 4 8 11 Keep all vents, drains and exhausts clear of any obstructions to ensure proper performance of each system. ➊ ➏ ➐ ➋ ➌➍➍ ➎ ➑ ➓ ➒ ➊ ➐...
  • Page 8: Main Cabin Top Deck Components

    MAIN CABIN TOP DECK COMPONENTS ➏ 1 2 3 6 7 ➎ ➌ ➍ ➊ ➋ ➑ ➐ 4 5 8 Sedan ➏ ➎ ➌ ➍ ➊ ➑ ➋ ➐ Sport Top ➏ ➍ ➌ ➊ ➑ ➎ ➐ ➋ Command Bridge ➊...
  • Page 9: Stern Components

    STERN COMPONENTS 1 2 4 5 6 7 8 9 10 ➓ ➊ ➊ ➏ ➋ ➋ ➌ ➌ ➎ ➐ ➐ ➑ ➍ ➒ ➊ ➏ Courtesy Lights Swim Platform Retractable Ladder ➋ ➐ Cockpit Drains Trim Tabs ➌ ➑...
  • Page 10: Fuse Location & Values

    FUSE LOCATION & VALUES The dash fuse blocks are located behind the hinged mirror located inside of the bathroom. Fuses are automotive blade type and all values are shown in amps. Dash Fuse Block #1 Dash Fuse Block #2 PANEL (4 Switch) TV #1 Head Lights PANEL (8 Switch)
  • Page 11 FUSE LOCATIONS AND VALUES CONTINUED These four blocks and fuses are located in the Quarter Berth aft storage area. The bilge pumps operate automatically with electronic fl oat switches when all switches and breakers are in the OFF position. However, the BILGE PUMP and BILGE PUMP2 will run continuously once their switches are placed in the on position.
  • Page 12: Main Cabin And Cockpit Lights

    MAIN CABIN AND COCKPIT LIGHTS Courtesy V-Berth Cabin Head Under Matress Light Switch Light Switch Light Switch Light Switch Light Switch ✓ ➊ Courtesy Lights ✓ ➋ Deck Aft Lights ✓ ➌ Cabin Lights ✓ ➍ V-Berth Lights ✓ ➎ V-Berth Bed Lights ✓...
  • Page 13: Battery Compartment

    BATTERY COMPARTMENT (4) House Batteries, (1) Engine Battery, (1) Thruster Battery (generator shares), Inverter/Charger Inverter Fuse (150 AMP), Inverter/Charger Cutoff Switch (Group 27, 1 each - start battery, 5 each - deep cycle batteries) AGM (4) House Batteries, (1) Engine Battery, (1) Thruster Battery (generator shares), Inverter/ Charger Inverter Fuse (150 AMP), Inverter/Charger Cutoff Switch (Group 31, 6 each - start/deep cycle batteries) AGM batteries required for boats with solar panel.
  • Page 14: Power Distribution Center

    POWER DISTRIBUTION CENTER Located in the starboard cockpit step. House, Engine, Thrusters and Crossover switch The parallel switch should always remain in the off position. While in the on position, the house and engine batteries will be combined as one for emergency start only. If the house bank drops below 10.8v you must reset the charging relay by switching on the parallel while the engine is running.
  • Page 15: Ac Distribution Panel, Rotary Switch & Dv Volt Meter

    AC DISTRIBUTION PANEL, ROTARY SWITCH & DC VOLT METER AC Distribution Panel AC Rotary Selector Switch. Available with Generator The AC Rotary Switch Selector Switch will determine which source of incoming 120 Volt power to use for your AC Distribution Panel. Inverter Bus AC Distribution Panel with optional Air Conditioning...
  • Page 16: Fuel System, Engine, Generator & Webasto Furnace

    FUEL SYSTEM, ENGINE, GENERATOR & WEBASTO FURNACE D6 Volvo 435 H.P. Diesel Generator 5.0 KW Onan, Webasto Furnace There is a secondary on engine fuel fi lter that is not shown on this drawing. You will be able to fi nd information about this fi lter in the diesel engine manual supplied with your boat. Fuel shutoff and all fuel fi lters are located on the Fuel Management Board, port side of engine room.
  • Page 17: Webasto Furnace

    WEBASTO FURNACE Webasto furnace is located under access panel below range. The controller is located at the quarter berth power management center. The pump is in the salon floor hatch compartment. Heat Vent Heat Vent Webasto Furnace Exhaust Fuel Pump / Filter...
  • Page 18: Air Conditioning System

    AIR CONDITIONING SYSTEM Air Conditioning System Air Conditioner Dislpay V-Berth Shower Sump Box Condensate Drain Raw Water Discharge Air Conditioner V-Berth 12kw Access from mid cabin Air Conditioner Salon 16kw Air Conditioner Dislpay located at Power Management Control Center Air Conditioner Pump Air Conditioner Thru-Hull Air Conditioner Sea Strainer...
  • Page 19: Generator

    GENERATOR Generator 5.0 KW Onan *Generator will start off of thruster battery #3 Generator Fuel Pickup Generator Fuel Return Fuel Shut Off Generator Fuel Filter Silencer Generator Exhaust Water Lock...
  • Page 20: Solar Panel

    SOLAR PANEL Solar panel 140 watt, with control panel • The solar panel is designed to provide charging to the house & engine batteries. 90% of its charge is dedicated to the house battery and 10% is dedicated to the engine battery. •...
  • Page 21: Shore Power

    SHORE POWER LAYOUT Shore Power AC Panel/ELCI Breaker Rotary Switch Shore Power Inlet (OPT) Second Shore Power Inlet for A/C Inverter Fuse Inverter Switch Inverter/Charger...
  • Page 22: Closed Engine Cooling System

    CLOSED ENGINE COOLING SYSTEM Provides alternate heating system for the Fresh Water Heater and provides primary heating source for the Forced Air Cabin Heater. This system is also designed to provide cooling to the internal components of your engine. Please refer to your engine operations manual for more information.
  • Page 23: Sea Strainer System

    SEA STRAINER SYSTEM Multi Port Sea Strainer for Marine Toilet and Raw Water Washdown Head Raw water washdown...
  • Page 24: Raw Water Wash Down

    RAW WATER WASH DOWN Johnson Aqua Jet 5.2 GPM • The raw water washdown pump and all components shown are accessible from the rear of the engine compartment.
  • Page 25: Fresh Water Plumbing System

    FRESH WATER PLUMBING SYSTEM 60 Gallon Fresh Water Tank, 11 Gallon Water Heater, 4.0 GPM Fresh Water Pump. Head sink cold Head sink hot Shower mixer cold & hot Galley sink hot Tank Galley sink cold Water Fresh water pump Heater Fresh water fill Tank vent...
  • Page 26: Shower Sump

    SHOWER SUMP 12V, 800 GPH (Sump should be inspected for debris on a regular basis if shower is used frequently.) • The shower sump box is located underneath the center removable teak and holly fl oor. Shower Sump...
  • Page 27: Bilge Pump System

    BILGE PUMP SYSTEM 12V 1000GPH The bilge pumps operate automatically with electronic fl oat switches when all switches and breakers are in the OFF position. However, the BILGE PUMP and BILGE PUMP2 will run continuously once their switches are placed in the on position.
  • Page 28: Waste System

    WASTE SYSTEM WITH MACERATOR PUMP 40 Gallon Tank with Macerator Pump Out (Opt.), Standard Dockside Pump Out, and Vent Waste tank fill level can be monitored by checking the electronic display in the head compartment. Green = Empty, Yellow = Half, Red = Full. Pump out can be done with the macerator or standard dockside pump out.
  • Page 29: Mast Set Up And Takedown

    MAST SET UP AND TAKEDOWN SED A N A ND S P O RT MAST SET UP PROCEDURE 1. Remove the two black plastic wing nuts from the mast base. 2. While supporting the mast, remove the pin in the support bar. 3.
  • Page 30: Cutwater 30 Wiring Schematic (Acc. 1)

    CUTWATER 30 WIRING SCHEMATIC (ACC. 1) -12V +12V Dash Fuse Block #1 To Subpanel 4 Switch (Bridge) RED 10 ORG/WHT 16 YEL 16 Horn Macerator YEL 10 RED 10 BRN 10 Pump Subpanel Macerator 8 Switch RED 10 Nav LT...
  • Page 31: Cutwater 30 Wiring Schematic (Acc. 2)

    CUTWATER 30 WIRING SCHEMATIC (ACC. 2) -12V +12V Dash Fuse Block #2 YEL 10 ORG 10 Trim Tabs Trim Tab - see MFR Schematic Wine ORG 10 YEL 10 Wine Cooler - see MFR Schematic Cooler ORG/GRY 10 YEL 10...
  • Page 32: Cutwater 30 Wiring Schematic (Acc. 3)

    CUTWATER 30 WIRING SCHEMATIC (ACC. 3) -12V +12V PDP Fuse Block Washdown RED 10 YEL 10 BRN 10 Washdown 12V Outlet RED/PUR 10 YEL 10 (Quarter Berth) ORG/PUR 10 YEL 10 Refrigerator Refrigerator - see MFR Schematic Refrigerator YEL 10...
  • Page 33: Cutwater 30 Wiring Schematic (Lighting)

    CUTWATER 30 WIRING SCHEMATIC (LIGHTING) -12V +12V Dash Fuse Block #1 RED 10 Wipers (Port & Stbd) To Acc. #1 Schematic Subpanel Bilge Pump (#1) RED 10 8 Switch To Acc. #1-2 Schematic (Helm) RED 10 Bilge Pump (#2) To Acc. #1-2 Schematic...
  • Page 34: Cutwater 30 Wiring Schematic (P.d.p.)

    CUTWATER 30 WIRING SCHEMATIC (P.D.P.) To Generator Control Panel 6 RED 1 RED To AC Panel To Bridge Fuse Block HOUSE 3/O RED 6 RED 1 RED To Quarter Berth Fuse Block 150A SWITCH 1 RED GENERATOR 6 RED To Quarter Berth Engine Fuse Block...
  • Page 35: Working Deck

    WORKING DECK Sedan Command Bridge...
  • Page 36: Care And Maintenance

    CARE AND MAINTENANCE The following checklists are examples and are not all inclusive and are provided only as a guide. Please customize to your personal needs. Consult your engine and trailer user manuals for additional information. EXAMPLE OF A PREPARATION FOR THE ROAD CHECKLIST TOW VEHICLE –...
  • Page 37: Example Of A Spring Pre-Launch Checklist

    EXAMPLE OF A SPRING PRE-LAUNCH CHECKLIST CLEANING Remove debris from scuppers and scupper drains. £ Clean hull using a mild biodegradable detergent and then wax. £ Clean topsides and decks using a mild biodegradable detergent and then wax. £ Clean and polish all bright work. £...
  • Page 38: Example Of Winter Storage Checklist

    Winterize all raw water cooling lines by cycling through all lines until it exits port side thru-hulls. £ Cutwater Boats recommends that to ensure proper winterization and to protect your valuable asset that you have an authorized dealer perform all winterization and service procedures.
  • Page 39: Reference Material

    REFERENCE MATERIAL The following table contains a list of reference materials provided by Cutwater that are con- tained under separate manuals. EQUIPMENT ORIGINAL MANUFACTURER Navigation System Garmin Engine C30 Volvo D6 435 H.P., gear model ZF 15 HS80 AE Furnace, diesel...
  • Page 40: Contacts

    CONTACTS Customer Service Andrew Custis Customer Service Manager Phone 253-839-5213 AndrewCustis@cutwaterboats.com Web Site www.Cutwaterboats.com...
  • Page 41: Notes

    NOTES...
  • Page 42 All rights reserved. Reproduction or translation by any means in whole or in part is not permitted without written authorization from Cutwater. The information contained herein is correct to the best of Cutwater knowledge and the contents may change without notice and without incurring obligation. 111016...
  • Page 43 Phone 800.349.7198 Fax 866.408.9516 cutwaterboats.com 17341 Tye St. S.E Monroe, Washington 98272...

Table of Contents