Alcatel Venice 5048A Service Manual page 25

Table of Contents

Advertisement

L1&L2 Service Manual
Please refer to following guide to paste conductive tape on Rear camera 2:
3) Before assemble the battery on the furnished underfilling, make sure AI key FPC, LCD & TP FPC,
LCD FPC HOLE mylar and main-sub FPC are well assembled on the furnished underfilling
4) Before assemble Sub PCBA on the furnished underfilling, make sure Sub PCBA conductive tape
and Vibrator are well assembled on the furnished underfilling;
5) Before assemble Sub PCBA on the furnished underfilling, make sure typeC rubber is well
assembled on the Sub PCBA; and paste SUB PCBA mylar on Sub PCBA after assemble sub PCBA
well on the furnished underfilling.
Rev.: 1.0
Venice 5048A_I_U_Y & 5148A_I Level 1 & Level 2 Service Manual
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
TCL
Communication Ltd.
rubber.
Make sure the 3
2
edge
tape
1
3
pasted
camera
area
parts
of
are
well
on
the
metal
Page: 25/32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents