Download Print this page

Wall Bed Factory Mission Assembly Instructions Manual page 9

Tube leg murphy bed

Advertisement

Step 9:
Have your helper stand at Foot of Bed and raise/lower Bed Frame (see A) to align Piston Head at
wide end of Air Piston with Pivot Ball on Side Panel Plate, while you Pop Piston Head onto Pivot Ball
(see B).
Step 10:
Repeat Step 8-9 to install second Air Piston on left side of bed.
WallbedFactory.com
1.800.975.8451
Assembly Instructions
Tube Leg Murphy Beds
B.
A.
Page 9 of 19

Advertisement

loading

This manual is also suitable for:

Mission horizontalCamdenHudsonFarmhouse