Download Print this page

Tools Needed; Included Hardware - Wall Bed Factory Mission Assembly Instructions Manual

Tube leg murphy bed

Advertisement

TOOLS NEEDED:

A. Stud Finder
B. Flathead Screwdriver
C. Power Drill w/ Phillips Head Screwdriver Bit & Drill Bits
A.

INCLUDED HARDWARE:

Bed Installation Parts
A. Air Pistons (2)
B. 3" Sheet Rock Screws (4)
C. 1 5/8" Hexagonal Screws (4)
D. 1 1/2" Zinc Screws (4)
E. Allen Wrench
OPTIONAL: Hardware Kit for Metal
Stud/Masonary Walls
Leg Installation Parts
A. Right-Facing Leg (1)
B. Left-Facing Leg (1)
C. Machine Screws (8)
(NOTE: Machine Screws are
pre-screwed into Bed Frame.)
**Please make sure all hardware is included. If anything is missing call 1.800.975.8451.
WallbedFactory.com
1.800.975.8451
B.
C.
A.
A.
Assembly Instructions
Tube Leg Murphy Beds
Phillips Head
Screwdriver Bit
B.
C.
Items Not to Scale
B.
E.
D.
Page 2 of 19

Advertisement

loading

This manual is also suitable for:

Mission horizontalCamdenHudsonFarmhouse