Download Print this page

Honeywell DPS 8 System Installation Manual page 49

Advertisement

REV B
TASK
4A.
INSTALL IMU CABINET
4.7-7,
ARE CLEAN AND FREE OF FOREIGN MATERIAL.
9.
ENSURE
THAT CABINET SHUTDOWN SWITCH,
LOCATED ON
OPERATOR CONTROL PANEL,
IS
IN OUT POSITION.
SEE
FIGURE 4.7-9.
3.
JOIN IMU/IMU CABLE CABINET TO MMU CABINET
IN
ACCORDANCE WITH SECTION 4.4.
CABINET,
CONNECT
GROUND
CABLE
FROM
IMU
To
MMU.
10.
ENSURE
THAT
ALL
CIRCUIT
BREAKERS,
LOCATED
AT
502
ARE
PROPERLY
SEATED'
REFER
To
FIGURE
4.7'8.
11.
VERIFY
THAT
COOLING
FANS
ARE
SET
AT
HIGH
SPEED

Advertisement

loading

This manual is also suitable for:

Wcpu66lbWi0u100aWi0u100bWi0u66laWmmu66lb