Symbols In This Manual - Triumph NTO-10A Manual

Overhead two post lift
Table of Contents

Advertisement

BOLT BOX CONTENTS
Cable
33'7" Long
7.25" (thread and blank)
4 5/8 Thread
Cable 5/16
½ Stud Threaded
Hole for cable is 5/8 (so can't use 3/8" Cables)
2 nuts 2 washers
TOOLS TO INSTALL
Hammer Drill
¾" Carbide Drill Bit
Various wrenches, pliers and screwdrivers
Block of Wood
Hammer
Torque Wrench
Tall Ladder
Fork Lift or other method of raising columns and toprails
Electrical connectors to connect 220 volt power unit (use Qualified Electrician)
Level
Chalk Line
Good O-ring Pliers
Grease for column
Chain oil for chains
Vacuum to clean dust from anchor holes
Rags
Allow at least 3-4 hours to set up lift.

SYMBOLS IN THIS MANUAL

Failure to comply with instructions could result in personal injury.
Failure to comply with instructions could result in property damage.
Important Information
Page 4 of 20

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Triumph NTO-10A

This manual is also suitable for:

Nto-9aNto-9ae

Table of Contents