B&S Commercial Kitchens CCF-HP Installation, Operating And Servicing Instruction Manual page 12

Ccf hi-pac flued chinese cooking table
Table of Contents

Advertisement

8. Reassembly is in reverse order.
9. If it is only the solenoid coil that is faulty this can be replaced without removing the valve from the
appliance.
Replacement of The Spark or Sense Electrode
1. Remove the front panel.
2. Remove the high tension lead from the pilot assembly.
3. Undo the locking nut and ease the electrode downwards until it comes out of the pilot assembly.
4. Reassembly is in reverse order.
Replacement of Ignition Module or Pressure Switch
1. Remove the front panel.
2. The control box can stay in the front panel.
3. Remove the 4 screws from the rear of the box and remove the rear cover.
4. Remove the wiring from the component to be replaced and ensure the wires are marked to enable
correct fitting to the new part.
5. Remove the screws holding the part into position and remove the part.
6. Reassembly is in the reverse order.
7. These parts must be replaced with identical make and model numbers as those originally
fitted.
Servicing WokSpout – Where Fitted
The WokSpout TM has a few wearing parts and these comprise a single flow control O-ring in the tap body
and two sealing O-rings on the swivel spout. Whilst it is expected that servicing would only be required at
approximately 200,000 cycles, it recommended that a preventative service be carried out every two years.
Please contact manufacturer for service kit.
Servicing Knee Valve – Where Fitted
The knee valve incorporates a cartridge design for ease of service.
1. Follow procedure described under GAINING ACCESS TO GAS AND/OR WATER SYSTEM
2. To gain access to knee valve cartridge undo knee valve where the deflector meets the cartridge
area.
3. REASSAMBLE IN REVERSE ORDER
In case of any failure in the functioning of the knee valve, unscrew the head assembly and clean the
mechanism under running water. Only use liquid cleaning products. All cleaning products
containing dry powder or powder in suspension are not to be used!
A specific devise is integrated in the cartridge unit to adjust the flow rate. To adjust the flow rate;
1. Undo head assembly
2. Pull off flow adjustor
3. On the exposed end of the housing there are 4 cut-outs for alternative flow rates.
4. Select one for increased/reduced flow.
5. Replace flow adjustor with window over selected cut-out
6. Screw head assembly into the tap body and tighten fully
Conversion from Natural Gas to LPG Gas
1. This appliance is for use only with Natural Gas
12

Advertisement

Table of Contents
loading

Table of Contents