Samsung NY36R9966P Installation Manual page 31

Dual fuel pro range
Hide thumbs Also See for NY36R9966P:
Table of Contents

Advertisement

Step 14. Final installation checklist
You have just completed installing your range. Make sure all controls are in the
OFF position and the flow of ventilation air to the range is unobstructed. The
following is a checklist to confirm your range is safely installed and ready for
operation.
Gas line has been properly connected to the range. The gas has been turned
on. All connections have been checked for leaks.
Range is plugged into the properly grounded electrical receptacle.
Approved anti-tip bracket is properly installed and engaged with the range.
Range is leveled and is firmly sitting on a solid, level floor.
All burners have been tested for proper operation.
Install_NY9900R_CHEF_NY36R9966PS_AA_DG68-01106B-01_EN+MES+CFR.indb 31
To adjust flame low setting
Identify which burner is exhibiting too high or too low simmer flame size, adjust
as necessary by following steps below:
1.
Simmer Set
Screw
2.
3.
WARNING
1.
Do not completely remove the valve set screw from the valve stem. The valve
set screw is an integral part of the gas valve assembly. Removing the valve
set screw will cause gas to leak.
2.
After adjusting the valve set screw, inspect the assembly for gas leaks.
Rotate a knob to "LO" position and
remove the knob from the valve shaft
while the flame is lit.
Carefully push the screw driver into
the stem of the valve, until it hits
the simmer set screw. Make sure the
screwdriver flathead is seated into the
set screw groove.
Rotate valve set screw clockwise to
decrease "LO" setting flame output, or
rotate set screw counter clockwise to
increase "LO" setting flame output.
English 31
2019-03-14
3:56:02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents