Samsung NY36R9966P Installation Manual page 23

Dual fuel pro range
Hide thumbs Also See for NY36R9966P:
Table of Contents

Advertisement

Step 5. Installing the conduit
Remove the conduit connection plate from the rear of the drawer body and rotate
it as shown below.
The conduit hole (1⅛") must be used.
1⅜"
1⅛"
1⅜"
1⅛"
Prepare the conduit cord shown in Figure 1.
1.
2.
Install the conduit cord as shown in Figure 2.
For conduit installations, insert the strain relief (not included) into the conduit hole
(1⅛"). Then thread the conduit cord through the body of the strain relief and fasten
the ring. Reinstall the bracket.
Install_NY9900R_CHEF_NY36R9966PS_AA_DG68-01106B-01_EN+MES+CFR.indb 23
Installing a 3-wire conduit
Strain relief
Ring
Body
Ground
strap
Figure 2
Neutral
terminal
4 wire
⅜"
3½"
Conduit
connection
1"
plate
3 wire
⅜"
3½"
Knockout
1"
surface
Figure 1
Aluminum building wire may be used but it must be rated for the correct
amperage and voltage to make the connection. Connect wires according to
Step 4 depending on the number of wires.
Wire used, location and enclosure of splices, etc., must conform to good wiring
practices and local codes.
Loosen the 3 lower terminal screws
1.
from the terminal block.
2.
Insert the center bare wire (white/
Red
Red
neutral) tip through the bottom center
terminal block opening. On certain
models, the wire will need to be
Wire tips
White
White
inserted through the ground strap
opening and then into the bottom
center block opening.
Black
Black
3.
Insert the two side bare wire tips into
the lower left and the lower right
terminal block openings.
4.
Tighten the screws until the wire is
firmly secured (35 to 50 inch-lbs.). Do
not over-tighten the screws since it
could damage the wires.
5.
Go to Step 6 on page 24 and proceed
with the installation.
English 23
2019-03-14
3:55:59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents