Page 1
Installation, Operation & Maintenance Manual RJ4.5 ODEL OLLING (CL4P9 Series 4-Post only) 4,500 lbs Capacity 200 Cabel Street, P.O. Box 3944 Louisville, Kentucky 40201-3944 Email: Web site: sales@challengerlifts.com www.challengerlifts.com Office 800-648-5438 / 502-625-0700 Fax 502-587-1933 READ THIS MANUAL COMPLETELY IMPORTANT: BEFORE INSTALLING or OPERATING JACK Rev.
Page 2
RJ4.5 Installation, Operation and Maintenance Manual CAUTION Before using this product, read and fully understand the operating instructions and all decals on the product. This is necessary to prevent injury to the operator and damage to the product. Roll jack forward before moving vehicle on or off lift.
Page 3
RJ4.5 Installation, Operation and Maintenance Manual NSTALLATION Place jack assembly on lift rack rails. Once side members are adjusted and jack is centered between the rails, tighten the (4) hex bolts (2 per side) to lock in place, Fig 2.
RJ4.5 Installation, Operation and Maintenance Manual Parts Breakdown Rev. 7/18/2018 RJ04H-IOM-A...
Page 5
RJ6-14 Cylinder Pin IMPORTANT! Replace all worn, damaged, or broken parts with parts approved by Challenger Lifts Inc. or with parts meeting Challenger Lifts Inc. specifications. Contact your local Challenger Lifts Parts Distributor for pricing and availability. (Call Challenger Lifts Inc. (502) 625-0700 for the Parts Distributor in your area) Rev.