Page 2
RJ15 Installation, Operation and Maintenance Manual CAUTION ♦ Before using this product, read and fully understand the operating instructions and all decals on the product. This is necessary to prevent injury to the operator and damage to the product. ♦ Roll jack forward before moving vehicle on or off lift.
Page 3
RJ15 Installation, Operation and Maintenance Manual Installation Install a ¼ NPT male quick disconnect coupling in Air Valve & Handle assembly. Match to shop fittings. Place jack assembly on lift rack rails. Jack requires a clean, dry and lubricated air source at 125 lbs.
Page 4
RJ15 Installation, Operation and Maintenance Manual Maintenance Weekly: Inspect jack and it’s components for damage or excessive wear. Replace parts as required. See parts list. Oil guide pins-DO NOT GREASE. The guide pins (visible when jack is in the up position) should be oiled every week or sooner if necessary with gear oil (80-90 grade).
HAFT OTCHED IMPORTANT! Replace all worn or broken parts with genuine Challenger Lifts, Inc. parts. Contact your local Challenger Lifts parts distributor for pricing and availability. Call Challenger Lifts, Inc. at (502) 625-0700 for the distributor in your area. Rev. 9/17/08...