Download Print this page

GE RAK7022 Installation Instructions Manual page 2

Transition duct adapter
Hide thumbs Also See for RAK7022:

Advertisement

Available languages

Available languages

STEP 2
Thumb screw hole location
(This step is necessary only if thumb screws were
not previously used.)
1. Slide the new transition duct into place. Push it all
the way in until it stops. Make sure the transition
duct is straight and not "cocked" relative to the
lateral duct adapter.
2. Center punch the transition duct mounting screw
hole locations into the lateral duct adapter.
Use the holes in the flanges at each end of the
transition duct as a template. Make sure that
the transition duct is all the way back when the
center punch impressions are made.
Lateral duct
adapter
3. Remove the transition duct and drill two 1/4"
diameter holes at the center punch locations.
Slide the metal clips onto the flanges at these
holes as shown in the illustration.
Transition duct
Metal clip
(flat side
down)
STEP 3
Chassis modification and installation
1. Remove the room cabinet front from the new
chassis by pulling out at the bottom to release it.
Lift it up to clear the rail along the chassis top.
2
2. Slide the chassis into the case and secure with
four screws through the chassis flange holes.
NOTE: The lateral duct adapter and mounting
brackets are omitted for clarity.
3. Test fit seals as described below before removing
paper backing.
4. Remove paper backing from each seal and place
as shown. Seal at right side should be located
towards left side of metal flange. It should be
flush with the top rear and extend over the lower
edge of flange. Seal at left side should be located
towards the right side of the metal flange. It
should be flush with the top rear and extend over
the lower edge of flange (as shown in illustration).
Be sure both seals are pressed into place on
the metal flanges (seals should be as close as
possible to screen without overlapping onto it).
1
Wall case
Foam gasket

Advertisement

loading