Download Print this page

GE RAB24 Installation Instructions Manual page 3

Standard steel wall sleeve for 24” thru-the-wall air conditioners

Advertisement

STEP 3: Installation of the wall sleeve in
the wall opening
OPTION 1
1. Position the wall sleeve into the wall. Refer to chart on
IMPORTANT:
Install wall sleeve level from side to side and with a slight
tilt from front to rear. Use a level; no more than a ¼ bub-
ble will be the correct wall sleeve slant to the outside.
in the appropriate location. Do NOT drill any holes in the
bottom of the wall sleeve.
Secure wall sleeve
Secure case through
side and/or top only
top only
2" min. from
sleeve bottom
case bottom
the wall sleeve.
NOTE: Do not drill any holes in the wall sleeve for electrical
connections.
Installation Instructions
Inside wall
Inside wall
STEP 3: Installation of the wall sleeve in
the wall opening (cont.)
OPTION 2
Installation of the wall sleeve into wall using
mounting brackets
Alternate applications using wall sleeve mounting brackets
ALTERNATE OPENING
15
"
2 x 4
FRAMING
ELECTRICAL WALL
RECEPTACLE
Solid Masonary Construction - Block
ALTERNATE OPENING
15
"
2 x 4
FRAMING
ELECTRICAL WALL
RECEPTACLE
Solid Masonary Construction - Brick and Block
ALTERNATE OPENING
15
"
2 x 4
FRAMING
ELECTRICAL WALL
RECEPTACLE
3
LINTEL PURCHASED LOCALLY
15
"
SLEEVE
LINTEL PURCHASED LOCALLY
15
"
SLEEVE
LINTEL PURCHASED LOCALLY
15
"
SLEEVE

Advertisement

loading